That is approximately 3,200 cubic feet.
60 x 40 x .05 = 1200 cubic feet, divided by 27 (as there are 27 cubic feet in a cubic yard) answer 44.44 cubic yards
First of all divide 2" by 12" to get 0.1666 feet; then multiply 0.1666' x 40' x 40' which equals 266.56 cubic feet; Multiply 266.56 cubic feet x 0.03704 to get 9.8734; Therefore, 2 inches of topsoil from an area 40 feet by 40 feet = 9.87 cubic yards. Hope that helps. The number 0.03704 is purely a conversion rate for cubic feet to cubic yards.
360 m
15 cubic yards
Yards are for measuring length not volume. Cubic yards required will be as follows: 1 cubic yard = 3 feet x 3 feet x 3 feet = 27 cubic feet Your concrete pad is 30ft x 40ft x 0.3333ft (4 inches assumed) = 400 cubic feet 400 divided by 27 = 14.8148 cubic yards required
Approximately 127.32 square feet.
Your pool's volume is 40ft x 16ft x 5.75ft = 3680 cubic feet. 1 cu.ft. = 1728 cubic inches 1 US gallon is 231 cubic inches 3680 x 1728 / 231 = 27528.312 US gallons in that pool.
2727 cubic feet
0.52 cubic yards = 14.04 cubic feet.
How many feet in a yard? A: 3How many cubic feet in a cubic yard? A: 3 * 3 * 3 = 27235 / 27 = 8.7
1.2 (cubic feet) = 2073.6 cubic inches
1.636254 cubic feet