Thats A Big Ditch.....But Take 100 And Divide By Three. Im Pretty Sure thats how you Do it
There are 3 feet to a yard, so there are 9 (3 x 3) square feet to a square yard, and 27 (3 x 3 x3 ) cubic feet to a cubic yard. The ditch measures 1 x 1 x 135 = 135 cubic feet, so that is 135/27 cubic yards = 5 cubic yards.
1 cubic yard = 27 cubic feet6 inches = 1/2 footVolume of the ditch = (12 x 78 x 1/2) = 468 cubic feet = 17 1/3 cubic yards
4.093 cubic yards
133.33 cubic yards, that's 400 feet
You can't fill a space with yards, only with cubic yards (27 cu.ft.).28 x 12 x 1/3 = 112 cubic feet / 27 cubic feet = 4.148148...cubic yards will be required.
-- 38,899 gallons -- 192.6 cubic yards
600 US gallons = 138,600 cubic inches = 80.208333... cubic feet = 2.9707 cubic yards. (rounded)
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).
42 cubic feet or 1.56 yards.
It depends upon how thick you want the concrete. For example, if you want the concrete to be 6 inches thick, then you will need 200 cubic feet. There are 27 cubic feet per cubic yard; so divide the 200 cubic feet by 27 to get 7.4 cubic yards.
None because it's a hole but 6 cubic yards of dirt will fill it up.
1 "yard" of concrete is really 1 "cubic yard" = 27 cubic feet8 x 8 x 4 = 256 cubic feet = (256/27) = 9.48 cubic yards