Want this question answered?
1 minute
A reason I can think of in which soldiers used trenches for is to take cover from machine gunfire. Also, the correct title is why trenches ARE important. Not is.
Trenches were used for hidding them selfs and to take cover from people on the opposite side , also could help by giving the soldies 30 seconds to get there gas masks when a gas attak hits them.
3 men dig 6 trenches in 4 days==> each man digs (6/3) = 2 trenches in 4 days==> each man digs (4/2) = 1/2 trench per day.==> Given 4 men, you get (4 x 1/2) = 2 trenches per day.==> It takes them (24/2) = 12 days to dig 24 trenches.
Much of the war was fought in trenches.
1 minute
A reason I can think of in which soldiers used trenches for is to take cover from machine gunfire. Also, the correct title is why trenches ARE important. Not is.
to protect the people so they will not die that easily and so they could take cover
Mainly to take photographs of the enemies trenches and check out what the enemy was doing
Chlorine gas was used to drive enemy men out of their trenches in order to make it easier to take the enemy trenches. Even now, it is used to soften up enemy positions.
Mostly to clear out enemy trenches and take control of no mans land
Trenches were used for hidding them selfs and to take cover from people on the opposite side , also could help by giving the soldies 30 seconds to get there gas masks when a gas attak hits them.
The trenches were dug in zigzags so the large machine guns cant take it out with one round
A reason I can think of in which soldiers used trenches for is to take cover from machine gunfire. Also, the correct title is why trenches ARE important. Not is.
Soldiers would dig trenches for protection. They also used them as a place to sleep during the war. They would take shifts so some people could sleep and others would be fighting. I hope this helps.
Around 3 years.
3 men dig 6 trenches in 4 days==> each man digs (6/3) = 2 trenches in 4 days==> each man digs (4/2) = 1/2 trench per day.==> Given 4 men, you get (4 x 1/2) = 2 trenches per day.==> It takes them (24/2) = 12 days to dig 24 trenches.