Well, you've essentially got 27 square feet (9' x 9' x 0.333') which is equal to 1 cubic yard.
It depends on how deep the concrete. 600 sq ft at 6 inch deep is 300 cu ft = 11.1 yards. 12 inch deep is 22,2 yards; 4 inch deep is 5.5 yards
123.44 cubic yards
4 yards
55.56 cubic yards.
That'll depend on the size of the pool.
It depends on how deep the concrete. 600 sq ft at 6 inch deep is 300 cu ft = 11.1 yards. 12 inch deep is 22,2 yards; 4 inch deep is 5.5 yards
If you pour to a standard 4-inch thickness you will need 5.6 cubic yards.
3,495.6 cubic yards.
If you use a standard 4-inch thickness you will need a minimum of 6.17 cubic yards.
14.8 yards
123.44 cubic yards
How deep? 1 inch will take .7 yards
4 yards
It is not possible to answer the question without knowing whether the patio is 11 ft x 10 ft or 11 yards *10 yards etc.
55.56 cubic yards.
.99 yds
1.1852 cubic yards for every inch the pad is deep.