If you use a standard 4-inch thickness you will need a minimum of 6.17 cubic yards.
Approximately 24.7 cubic yards or 31.7 tons of gravel.
3
3
123 tiles
One. A standard .44¢ postage stamp.
If you pour to a standard 4-inch thickness you will need 5.6 cubic yards.
need quote on installed concrete patio
You will need 0.56 cubic yards of concrete.
You will need 17.8 cubic yards of concrete.
how many yards of concrete will i need to do a 20 x20 x4 slab
My patio is cracked very badly. Can I get the concrete resurfaced or do I need to redo it?
1.85 cubic yards.
You will need 1.23 cubic yards.
10 yards
At 4" thick you will need 1.23 cubic yards.
2.96 Cubic Yards
3.56 Cubic Yards