A 14'x14'x4" inch slab will require 2.42 cubic yards of cement.
How deep? 1 inch will take .7 yards
For a 4-inch depth you will need 7.41 cubic yards.
If you use a standard 4-inch depth, you will need at least 8.9 cubic yards.
1.5 cubic yards of cement are needed for an 11' x 11' x 4" slab.
You can't express a volume of concrete in yards.
532.4074 yards of concrete, round up to 533 yards.
2.2469 cubic yards for each inch of depth.
A 14'x14'x4" inch slab will require 2.42 cubic yards of cement.
123.44 cubic yards
It depends on how deep the concrete. 600 sq ft at 6 inch deep is 300 cu ft = 11.1 yards. 12 inch deep is 22,2 yards; 4 inch deep is 5.5 yards
How deep? 1 inch will take .7 yards
For a 4-inch depth you will need 7.41 cubic yards.
1000 square feet/9 = 111.1 square yards of concrete 6 inches thick. This is the same as 111.1/4.5 = 24.7 cubic yards of concrete.
For a 4-inch thick slab, you will need at least 9.48 Cubic Yards.
If you pour to a standard 4-inch thickness you will need 5.6 cubic yards.
If your pour to a standard 4-inch depth, you will need 3.54 Cubic Yards.