for preparing cement mortar C.M.(1:6) number of cement bags required are nearly 5.14 bags.calculation: for preparing 1 cu.m wet C.M(1:6), dry material required is 25% extra.therefore dry material required is 1.25 cu.mhence cement required=1.25/(1+6)=0.178 cu.m(sand required=0.178*6=1.068 cu.m)density of cement=1440 kg/cu.m=>cement required in kg=0.178*1440=256.32cu.mwt. of cement in kg per bag=50kgtherefore no. of bags required is=26.32/50=5.14bags.thank u.
About 24 cubic yards of cement is required for a slab that size.
9.3 cubic yards of cement is required for this slab.
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
9 of them
4.50/bag cement, required for 1 cubic metre of concrete ( M10).
3
315 Kg/M3 approx.
M20 - 6.20bags
5,000,000 barrels of cement were used to make the 4,300,000 cubic yards of concrete required.
One cubic meter of rough (paddy) rice weighs about 577 kilograms or 1,273 pounds.
M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50
1 bag
As much as the engineered load calls for to perform the task the cement is required to perform.
147 cubic feet of cement are required.
It depends on the type of structure according to the load subjected