how much did it cost to build the martin luther king jr memorial
a lot
1.2.4 thousdand
$4,284.000
enough
The ground breaking for the Lincoln Memorial was on February 12, 1914. The memorial sits on 6.3 ares of land, cost $2,957,000 to build, and has an estimated weight of 38,000 tons!
It took approximately 6 months to build Memorial Stadium in Lincoln, Nebraska in 1923. The cost of construction was $430,000. The stadium was expanded seven times between 1964 and 2013 and renovated in 2006.
The actual cost will determine the answer.
The ground breaking for the Lincoln Memorial was on February 12, 1914. The memorial sits on 6.3 ares of land, cost $2,957,000 to build, and has an estimated weight of 38,000 tons
There was originally $2,000,000 dollars set aside for the construction of the Lincoln Memorial, but its' final cost was Approx. $3,000,000.
2,089,567,472 dollars
850,000