Depends on the gang. If it's a Plasterer and a Labourer, then I'd say upto 100m. THough it'd be a long hard day
Depends on the size of the School,
yes .. because in future ,the development of infrastructure is growing day by day. so those who are interested in this field take this opportunity.
ST 4 concrete is the stronger out of the two. ST4 is equivalent of 16 kn at 28 day strength where as ST2 is only 8 kn at 28 day strength.
Seven days strength of any concrete usually comes 67% of 28 day strength. So 7 day strength of M30 may be .67*30=20.10 MPa
No. Concrete never gets any bigger than the day it is poured.
1 mason and 1 helper will finish about 40 to 50 sq.m. per day (8 hours) depending on the area.
That Day Is Done was created in 1989.
Day Is Done was created in 1969.
No, Sarah is not done work for the day!
Each day, according to a US study done by Caprid University, 2,000,000 pounds of poop are created each day.
Until the Day Is Done was created in 2007.
He dallied for much of the day and so he got very little work done.
Pretty much what it says. Something to be done and repeated after a nine day interval
Depends what country your in. First of all you have your; 1. Plasterboard (presuming you are refering to dry wall plastering).. 2. Your setting material (ie. joint compounds) 3. Cornice. 4. Labour costs if you are planning someone to do it for you.
Monday thru Friday
Probably to give our mom's a break and show them how much we appreciate what they have done for us and show we love them.
They should get fed just enough that can be consumed in a few minutes, as to not overstuff them. This should be done 2 times a day.