A good mix is four or five of sand to one of cement.

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

How much cement sand and stone do you need for 1 cubic meter of concrete?

How much cement sand and stone do you need for 1 cubic meter of concre


How much sand and gravel do you need to make 1 cubic metre of concrete?

1 and half tons


How much sand and gravel do i need to mix 1 yard of concrete?

To mix 1 yard of concrete, you typically need about 1.5 tons of sand and 1.5 tons of gravel. This is based on a common concrete mix ratio of 1 part cement, 2 parts sand, and 3 parts gravel. Therefore, for 1 yard of concrete, you would use approximately 0.5 yards of cement, 0.75 yards of sand, and 1 yard of gravel. Always consider adjusting the proportions based on specific project requirements or desired concrete strength.


How much sand gravel and cement do you need to make 1 cubic yard of concrete?

500 pounds cement, 1500 pounds sand, 1600 pounds gravel. Mix with 32 gallons water


How much sand and cement you need to lay 65 sqm?

To lay 65 square meters of concrete, the amount of sand and cement required depends on the thickness of the concrete layer. For a typical thickness of 10 cm, you would need approximately 0.65 cubic meters of concrete. A common mix ratio is 1 part cement to 2 parts sand to 3 parts gravel. In this case, you would need about 130 kg of cement and around 0.26 cubic meters of sand. Adjustments may be necessary based on the specific mix design and project requirements.


How can I install pavers on top of concrete?

To install pavers on top of concrete, you need to clean the concrete surface, apply a layer of sand, place the pavers on top, and secure them with edging. Fill the gaps with sand and compact the pavers for stability.


How much sand and gravel to make 6 yards of concrete?

To make 6 yards of concrete, you'll typically need a mix ratio of 1 part cement, 2 parts sand, and 3 parts gravel. For 6 yards of concrete, this translates to approximately 1 yard of cement, 2 yards of sand, and 3 yards of gravel. Since concrete is often measured in cubic yards, you'll need to ensure you have the correct volume of each material to achieve a total of 6 yards.


What do you need to make cement?

you mean concrete I think? you need cement, sand and water in a specific ratio.


How much sand and gravel in needed to make a cubic yard of concrete?

To make a cubic yard of concrete, you typically need about 1.5 tons of sand and 1 ton of gravel, depending on the mix design. A common concrete mix ratio is 1 part cement, 2 parts sand, and 3 parts gravel, which translates to approximately 0.5 cubic yards of cement, 0.5 cubic yards of sand, and 0.75 cubic yards of gravel for a cubic yard of concrete. Adjustments may be necessary based on specific project requirements or desired concrete strength.


How much sand cement and water needs 1M3 foamed concrete?

different density need different sand ,cement and water , cement and water is about 2:1 , details please visiti website:httP://www.foamed.com.cn


Does a snail travel faster on sand or concrete?

Concrete because the sand would burn it.


What weighs more wet sand or dry concrete?

Dry concrete weighs more than wet sand because concrete is denser and more compact than sand, even when wet. Concrete is composed of cement, sand, gravel, and water, which results in a heavier material compared to sand alone.