How much sand and gravel and concrete to make one yard?

To make one cubic yard of concrete, you typically need about 1.5 tons (or 3,000 pounds) of sand and gravel combined. The standard mix for concrete is roughly 1 part cement, 2 parts sand, and 3 parts gravel, along with water. This means you would generally use about 0.5 cubic yards of sand and 0.75 cubic yards of gravel for each cubic yard of concrete. Adjustments may vary based on the specific mix design and desired strength.


How much sand and gravel do i need to mix 1 yard of concrete?

To mix 1 yard of concrete, you typically need about 1.5 tons of sand and 1.5 tons of gravel. This is based on a common concrete mix ratio of 1 part cement, 2 parts sand, and 3 parts gravel. Therefore, for 1 yard of concrete, you would use approximately 0.5 yards of cement, 0.75 yards of sand, and 1 yard of gravel. Always consider adjusting the proportions based on specific project requirements or desired concrete strength.


How much sand stone and cement do i need to cast 41 yards of concrete?

To cast 41 cubic yards of concrete, you typically use a mix ratio of 1 part cement, 2 parts sand, and 3 parts gravel (aggregate). For 41 yards of concrete, you'll need approximately 6.8 cubic yards of cement, 13.6 cubic yards of sand, and 20.4 cubic yards of gravel. Adjust the mix based on specific project requirements or concrete strength needed. Always consider adding water based on the moisture content of the materials and desired workability.


How much sand and gravel do you need to make 1 cubic metre of concrete?

1 and half tons


How much portland cement sand and gravel for a yard?

To make one cubic yard of concrete, you typically need about 1 part Portland cement, 2 parts sand, and 3 parts gravel. This translates roughly to 1 bag (94 lbs) of Portland cement, 0.5 cubic yards of sand, and 0.75 cubic yards of gravel. Adjustments may be needed based on the specific mix design and desired strength. Always consult local guidelines or concrete calculators for precise measurements.

Related Questions

How much sand and gravel and concrete to make one yard?

To make one cubic yard of concrete, you typically need about 1.5 tons (or 3,000 pounds) of sand and gravel combined. The standard mix for concrete is roughly 1 part cement, 2 parts sand, and 3 parts gravel, along with water. This means you would generally use about 0.5 cubic yards of sand and 0.75 cubic yards of gravel for each cubic yard of concrete. Adjustments may vary based on the specific mix design and desired strength.


How much gravel needed to make a gravel road 180 yards long x 3 feet wide x4 inches deep?

You will need 20 cubic yards or 25.7 tons of gravel.


How much sand and gravel do i need to mix 1 yard of concrete?

To mix 1 yard of concrete, you typically need about 1.5 tons of sand and 1.5 tons of gravel. This is based on a common concrete mix ratio of 1 part cement, 2 parts sand, and 3 parts gravel. Therefore, for 1 yard of concrete, you would use approximately 0.5 yards of cement, 0.75 yards of sand, and 1 yard of gravel. Always consider adjusting the proportions based on specific project requirements or desired concrete strength.


How much sand stone and cement do i need to cast 41 yards of concrete?

To cast 41 cubic yards of concrete, you typically use a mix ratio of 1 part cement, 2 parts sand, and 3 parts gravel (aggregate). For 41 yards of concrete, you'll need approximately 6.8 cubic yards of cement, 13.6 cubic yards of sand, and 20.4 cubic yards of gravel. Adjust the mix based on specific project requirements or concrete strength needed. Always consider adding water based on the moisture content of the materials and desired workability.


How much concrete to make a 8 feetx8feetx4inch slab?

0.79 Cubic Yards


How much sand and gravel do you need to make 1 cubic metre of concrete?

1 and half tons


How much gravel is needed to make a 60cm x 60cm x 4.5cm concrete slab?

231


How much portland cement sand and gravel for a yard?

To make one cubic yard of concrete, you typically need about 1 part Portland cement, 2 parts sand, and 3 parts gravel. This translates roughly to 1 bag (94 lbs) of Portland cement, 0.5 cubic yards of sand, and 0.75 cubic yards of gravel. Adjustments may be needed based on the specific mix design and desired strength. Always consult local guidelines or concrete calculators for precise measurements.


How much concrete was used to make Three Gorges Dam?

5,000,000 cu yards


How much is 3 yards of concrete delivered in Idaho?

How mush is a price of 5 yards of concrete delievered


How much gravel for 25feet by 4feet by1inch?

You will need 0.309 cubic yards (about 600 pounds) of gravel.


How much gravel should be placed under concrete for proper installation?

A minimum of 4 inches of gravel should be placed under concrete for proper installation.