you need to give more details of the model (2.4 or 2.7) number of doors etc. the new exhaust (full exhaust) should not set you back more than £75 (around 60 ish would be better) and labour would probably add around the same.
The 2002 Ford escape exhaust manifold will cost approximately $550 to replace. The manifold will cost $300. The labor cost will consist of approximately 4 hours of labor.
multiply the cost of labor by the cost of materials. add the cost of labor and materials. subtract the cost of labor from materials. divide the cost of labor by the cost of materials. which one is correct
You are looking at $500 at least plus labor (price varies depending on state).
Intake manifold or exhaust? The complete job (parts and labor) is between $700-$900. depending on labor rates.
Typically, replacing an exhaust will cost between $200 - $300, or the regional equivalent. Replacing an exhaust for a Peugeot 206 should not cost more than $300. Customers should be wary of scams, as certain garages may overcharge for some services.
It can cost around $75 to $150 per hour in labor not including parts. The parts can run you around $200 to $500.
Depends if your removing to upgrade/ replace or convert to normal aspirated? To rebuild- Few hundred bucks. to upgrade- $600-1200 parts+labor to convert- exhaust manifold, exhaust piping, computer/chip/programming- $1000+labor
The cost to replace the exhaust system on a 1998 Ford Falcon can vary widely depending on factors such as the type of parts used (OEM vs. aftermarket), labor costs, and the specific exhaust configuration. On average, you might expect to pay between $500 to $1,200 for parts and labor combined. It's advisable to get quotes from local mechanics or exhaust specialists for a more accurate estimate based on your location and specific needs.
522
around$10.
Labor cost variance means the difference between standard labor cost and actual labor cost.
Labor costs should be no more than 20 to 30 percent on a construction project. The cost may be lower for residential projects and higher for commercial projects.