answersLogoWhite

0


Best Answer

mg= mass * gravity = 110 * 9.8 =1078

W=mg*height=1078*12m=12,963 J

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How much work is needed to raise a 110kg load of bricks 12m above the ground to a building under construction?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is Bill Of material what information it contain?

A bill of material - is simply a list of items needed to complete the construction of something. For example - for building a house it would list things like timber, bricks, roofing slates, glass, doors, mortar, sand etc... It would show what materials are needed, the quantities and price.


Where use the reinforced brick in builing construction?

Reinforced bricks are commonly used in building construction for structural elements such as load-bearing walls, columns, and foundations. The reinforcement adds strength and helps withstand stress, making them ideal for supporting structural loads in buildings. They are especially useful in seismic areas where extra strength and durability are needed.


Minimum length of a grounding electrode?

A standard ground rod is 5/8 x 10'. The amount of rods needed is governed by the electrical code. The largest type of grounding system is a Ufer ground. This is where the bare grounding conductor is embedded in the footings of the building and the weight of the building presses the ground wire to the earths surface. These types of grounds are used mostly in construction and are requested by electrical engineers.


How many bricks needed for 1010 feet?

depends on how big the bricks are


How did the construction of the Suez Canal support nation building?

well they got more trade and things they needed so they got it :)


Can you use the word forty in a sentence?

Yes. I am forty years old. There are forty tons of bricks needed to build this office building.


How might big construction projects Ike the building of canals lead to lawa and governments?

They needed structure and rules so that they can be organized


How many bricks would you need if the area of a patio is 396 square feet and the bricks are 9 x 8?

If the bricks are in feet then 51/2 bricks would be needed.


What does site induction mean?

Site induction is the actual plan of the site whey by the engineer list everything needed during the construction of a building


What are codes for building a deck in edmonds Washington?

A building permit may be needed for adding a deck or patio in Edmonds, Washington. The type of permit and codes depends on the height, location and construction of the deck.


How can you get a construction job abroad?

A construction job can be achieved aboard by working for the many private contractors that have been hired to work in the war zones of Afghanistan. The construction work would involve building bridges and dams that are needed in warfare and available on a high demand basis.


What are the contract documents needed before the builders may start with any construction activities on a building site?

just make sure that you know what you want doing