Loosen the tensioner pulley. The alternator belt will become loose. Take off the belt. Remove the wiring harness from the alternator. Remove the retaining bolts from the alternator. Remove the alternator. Reverse the process to install the new alternator.
Should be attached directly to the alternator.
How do you get to the fuel pump
2JZ-GE Engine # Disconnect the negative battery cable. Wait at least 90 seconds before performing any other work. # Remove the engine undercover. # Turn the drive belt tensioner clockwise and remove the drive belt from the engine. # Disconnect the generator electrical connector. # Remove the rubber cap and nut and then disconnect the alternator wire. # Disconnect the alternator wire clamp from the wire clip on the alternator. # Disconnect the A/T coolant hoses and bracket from the alternator by removing the bolt and pipe clamp. # Remove the alternator bolt, nut, pipe bracket and then remove the alternator from the engine. To install: # Install the alternator and pipe bracket. Torque the bolt and nut to 27 ft. lbs. (37 Nm). # Install the A/T oil cooler pipes to the alternator and install the bolt and pipe clamp. # Connect the alternator wire clamp to the wire clip on the alternator. # Connect the electrical wire to the alternator and install the nut. # Install the alternator electrical connector. # Install the drive belt. # Install the lower engine cover. # Connect the negative battery cable. # Start the engine and check the charging system for proper operation
take new alternator back where u bought it and get another
T-Bird Rhythm was created in 1982.
The duration of T-Bird Gang is 1.08 hours.
T-Bird Gang was created on 1959-10-16.
John T. Bird was born on 1829-08-16.
John T. Bird died on 1911-05-06.
T bird
There is only one: 84.
Roland T. Bird was an American Paleontologist who discovered the Glen Rose Trackway