Want this question answered?
If a validation study is conducted before placing a product in the market, then it is called prospective validation. If a product is placed on the market during the validation study, it is called as concurrent validation.
The figures needed validation before the accounts could be done.
batch validation is a programmed validation to achieve valid data. its done after data entry and before data cleaning. batch validation can be over night process or day process.
Field validation ensures that a program or form is using clean incorrect data. A set of validation rules are used to check data that is entered into a system before it is processed.
It is important to be as accurate as possible in entering the data. Anything that can be done to help that is beneficial. So being able to validate what is entered is important. The amount of errors made can be reduced. So validation is supplied in spreadsheets to assist that process.
An accounting code structure.
At Microsoft download center you should be able to find such information http://www.Microsoft.com/downloads/Search.aspx?displaylang=en# typically windows will run a validation before installing media player 11 so if you just download and install media player from the above link it should run a validation before hand.
Validation rules limit what can go into a field. You might want to only allow values that are over 500 in a field, so the validation would be: >500 You might want dates that are before the 1st of January 2010, so that would be like this: <#01/01/2010#
TERRITORY
No.
before (100% positive)
I invented christmas and swam to hawaii before it was on maps