is retension applicable to variationorder
The order in which that are sequenced and variation in that order.
A variation order is a 'change' which the Architect may be issued to make to the drawings, such as putting in a new window. The Architect will then inform the builders of the variation.
Doric
Is is my belief that variation, selection and retention lies behind any innovation as illustrated by the innovation funnel. The task for the organization is to increase the effectiveness of the process by:1- increasing variation through involving many individuals, stimulating open-minded and creative thinking2- pre-selecting for higher success rate based on maximum foresight and support promising ideas3- scale up and replicate successful solution to maximum effective level-Zheng
Without variation there is nothing to select from.
The superintendent of the contract.
RELEARNING
valve, number 3.
It is called a List of Applicable Publications (LOAP).
the difference between retention time and retention factor is that the retention time is a quatitative value where`s the retention factor is a qualitative on.
variation order is the extra work done outside your original contract. you should have a variation order form filled and the clients authorization. all the records of material and labour charge should be recorded so that the client can be billed. an example of variation order is say if your contract says you to change the light bulb but found out that there is a wrong cable used and needs to rewire with new cable then u need to inform client and need their authorization in order to rewire them.
You have to have variation in order to be able to have more successful variations, which succeed in evolutionary terms, and less successful variations which fail. If there were no variation in a species, there would be no natural selection.