M20 Mrefers to mix and 20 refers to 20 n/mm2 strengh and M200 mix 200n/mm2
1:2:4
1:1.5:3
1:1.5:3 (cement,stone,sand)
it is concrete mix which gain strength 20kn/mm2 in 28 day of curing....
does not exceed 30N/mm2
Mix ratio for M5 concrete is 1:1.5:3compressive strength is 20N/mm2 @ 28 days.1 part of cement, 1.5 part of sand, 3 parts of coarse aggregate.
Usually for a design mix as per Indian Standards when the mix proportions are arrived for M25,the total cement consumption will be around 400 kg.From that the number of cement bags will be 8 numbers for 1 cum
density of send and aggrigate
Concrete :- a mix of cement, sand, water, and gravel. Mortar :- a mix of cement, sand, and water
Concrete :- a mix of cement, sand, water, and gravel. Mortar :- a mix of cement, sand, and water
During concreting first of all we have to take an adequate quantity of aggregate,sand,cement& water according to standard mix design.Then prepare a proper mix which is nothing but concrete