One of the least important considerations at the beginning of an automation project is the micro-controller. There are a wide range of them available and they offer a vast array of functionality. The major manufacturers of micro-controllers offer tiny 8 pin devices through 100 pin ICs that have a remarkable set of functions.

Before thinking about the micro-controller to use, it is vital that the functional specification of the final product is considered. Without that specification, choosing a micro-controller is nothing more than guess work.

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

What can be done to improve safety on this project?

What can be done to improve safety on this project


Why Van Buren carried loaded pistols?

he carried them as a safety precaution against violent outbursts


Benefits of automation?

Automation can increase productivity, time per part becomes predictable, safety can increase when automated equipment is properly used and installed, and parts or process becomes much more repeatable.


The benefits of increased automation of devices that could put us in danger if they malfunction outweigh the risks?

Increased automation of potentially dangerous devices can enhance safety by minimizing human error, which is often a significant factor in accidents. Advanced automation systems can incorporate real-time monitoring and rapid response capabilities, reducing the likelihood of catastrophic failures. Furthermore, automated systems can be designed with multiple safety redundancies, ensuring that if one component fails, others can mitigate the risk. While risks still exist, the overall improvement in control and efficiency makes automation a valuable advancement in safety management.


What is the difference between the Taurus PT99 handgun and Beretta 92fs?

The main difference is the Taurus has a manual safety and can be carried as a single action gun. The Beretta has a decocker/safety combo, and it cannot be carried in single action mode with the safety engaged.


Why should you do hand safety on my science project?

you should do hand safety on your project because if you are using chemicals, animals, or sharp objects, you will need your hands to be protected.


What are the limitations of railway automation?

There are no limitations. However, the cost and practicality limit the automation to supplemental systems for safety critical operations. This is simply due to the fail-safe or fail-reliable requirements, depending upon the system, and the increased costs. These costs cannot be justified for railways today for more than supplemental automation.


What tasks relating to health and safety should not be carried out without special training?

How and when to report potential health and safety risks


Why is the new tank project carried out?

The new tank project is initiated to enhance operational efficiency and meet increasing demand for storage capacity. It aims to improve safety standards and environmental compliance while also incorporating advanced technology for better monitoring and management. Additionally, the project is designed to support future growth and adapt to changing market conditions. Overall, it represents a strategic investment in infrastructure.


Who carried the reign of terror in France?

Maximillien Robespierre of the Committee of Public Safety.


Who carried out the reign of terror'' in France?

Maximillien Robespierre of the Committee of Public Safety.


What is a Preliminary Health and Safety plan?

Under the Construction Regulations 2006, A Project Supervisor for Design Process (PSDP) must be appointed at the design stage of a construction project which is likely to have a duration exceeding 30 days or there is a specific risk associated with the project.Part of the PSDP's duties is to prepare a preliminary health & safety plan which aims to provide those tendering for the contract with relevant information concerning the percieved safety issues the successul tenderer is likely to encounter throughout the project. The preliminary health & safety plan will also contain other information such as:General description of the project;Any other work activities taking place on site;Work involving particular risks;The timescale for the project;Conclusions drawn by designers and the PSDP having carried out design risk assessments and any existing Safety and Health Plan or Safety File;The location of electricity water and sewage connections so as to facilitate early establishment of welfare facilities.Surrounding areas / processes to be considered.For more information on preliminary health & safety plans please check out my website www.targetsafety.ie .