answersLogoWhite

0

If you have mostly clay soil and need good drainage for your plantings then yes - and you will need to make the area slope away in wet lands or slope toward the planting area in dry areas.

User Avatar

Wiki User

17y ago

What else can I help you with?

Related Questions

How do I install a pond?

Installing a pond can be complicated. You'll need to excavate soil, compact the soil and lay down a soil and water barrier, then place the water.


What word means Removes soil by digging?

The word you're looking for is "excavate". It refers to the clearance of soil or other materials by digging.


How much top soil do you excavate before construction?

about 60 Cm 1-bad soil ~20 cm 2-for protect of freezing ~60 Cm


Why do you think is necessary to excavate the site in construction?

I think it will help to have a proper soil for the foundation to be laid


What is the capacity of EX200 per hour?

IT largely depends on the soil nature. On an average, in ordinary clayee soil it can excavate up to 50cum per hour.


What is the meaning of excavate?

of Excavate


When should I put the natural grass fertilizer down?

Grass fertilization should be done in spring or fall. It is preferable to spread fertilizer before a rain so that it soaks into the soil.


How far down should tulip bulbs be planted in the soil?

Tulip bulbs should be planted about 6 to 8 inches deep in the soil.


How long to excavate a 3 story apartment building?

The time it takes to excavate a 3 story apartment building can vary depending on factors such as the size of the building, the soil conditions, and the equipment available. Typically, it can take several weeks to excavate a building of that size. It is important to have a detailed excavation plan in place to ensure the process is completed efficiently and safely.


Was steam power used to excavate this part of the canal?

Yes, steam power was commonly used to excavate canals during the 19th century. Steam-powered dredges and excavators were employed to remove soil and other materials efficiently, speeding up construction of canals.


How many cubic meter will excavate a backhoe per hour?

The cubic meters of aggregate that a backhaul can excavate in an hour is dependent upon the size of the backhoe. Typically, a backhoe can ask of a 100 cubic meters of aggregate per hour.


What do you need to do to prepare the soil for a holly bush?

Excavate a hole twice the size of the rootball. Break up the bottom of the hole and incorporate some compost or other fibrous material. Scatter some fertiliser on the loose soil place the holly in the hole so that the soil level is the same as the soil mark on the bush. Fill in the hole and firm the soil down with your feet water well and stake. Keep well watered until you are sure it is growing.