Want this question answered?
Difference between control process and process control is that system control process is typically the large scale version of where process control is used.
three basic categories of control
the three basic categories of control?
Describe the evaluation process for Operational Control Describe the evaluation process for Operational Control
process control is the one where we study about different process like temperature, flow, pressure, level, etc.,. and about different controllers like P, PI, PD, PID controllers to monitor and control the process automatically. ============================================================ The above although correct is not reflective of what process control engineers do which is more generic than working on controllers. Ultimately the job of a process control engineer is to do one of three actions i) to stabilise the process ii) to optimise the process by incrementing yield and or throughput iii) to optimise energy usage. How this is achieved by the process control engineer is the utilisation of control engineering knowledge (which includes the knowledge of control algorithms such as PID), but additionally incorporates an enormously diverse field such as process operations, process technology, signal processing, statistics and stochastics while supported by other fields such as computing and decision theory. Its the wide array of sub-technologies that are needed to effectively apply process control that on one hand interests some while on the other hand scares other. Ultimately as with all other forms of technology, process control and especially the higher forms of control are applied to generate step improvements in control stability and thereafter profitability.
Awareness, educational, avoidance
so the question about categories is about a category or people who control categories. but this categroy is for categories, not category people who control those categories. So this category is the wrong category. Try a different category to answer a question of this category.
there are three categories of control structure 1 sequential 2 selective 3 repetitive
Difference between control process and process control is that system control process is typically the large scale version of where process control is used.
Awareness, educational, avoidance
Awareness, educational, avoidance
process control
three basic categories of control
Awareness, educational, avoidance
the field of proces control en instrumentation deals with monitoring process parameters en adjust the process (control) based on that information. instrumentation is required to monitor and control the process, and varies from process to process
the three basic categories of control?
One characteristic of control process used in management is that it is forward looking. Each level of an organization has control and a control process that is a continuous process linked to planning.