Want this question answered?
the water vapor takes a short time
What are the 3 parts of the time cycle
Lead time is typically used to specify how long the delivery of a piece of equipment will take from purchase order to delivery. Cycle time is the amount of time measured in seconds or minutes a piece of equipment operates at. This is measured from the start of one cycle to the start of the next cycle.
A work measurement system has three components: preferred methods, time values, and reporting.
Yes, the water cycle is always happening 24/7. When it snows in the winter time that is part of the water cycle
to produce a specific number in a given time
business cycle
Operating cycle is the time which required by the business from acquiring inventory to production and selling of products and generating revenue.
lack of the enzymes needed to control the cell cycle overproduction of those enzymes or production of other enzymes at the wrong time all can cause the cell cycle to become uncontrolled
about the amount of time your mom is alive
The terminology in the electrical trade as to duty cycle refers to the amount of "on time" as to the "off time". When referring to equipment that have a high current on time, it is usually using components or wire that are sized smaller than what they should be and can not cool themselves.These components can not dissipate the heat generated quick enough and can only be on for a certain amount of time. This type of equipment is given a duty cycle. The duty cycle has to have an equal or greater off time to let the equipment cool down. It is this ratio of "on time" to "off time" that is the equipment's duty cycle.For example, motors due to their design usually have a 100% duty cycle, meaning that the motor can operate continuously without having to be shut down to allow it to cool off.
Production rate of injection molding machine depends upon cycle time (total time that machine takes to produce a product in one cycle) and the number of cavities. For calculating cycle time, you must consider time for each phase that machine takes in one cycle. That phases are: Mold closing / clamp Filling Pack and hold Cooling and Recovery (40-60% ) Mold Open Ejection Add time taken by each phase. For example, this time is 15 seconds and the number of cavities are 2. So the production rate is 2 finished product per 15 seconds. You can increase your production by decreasing the cycle time. You can decrease cycle time by following some points: Keep wall thickness to minimum required for your product Ensure your machine is fine-tuned Ensure proper cooling system, injection pressure and injection speed is applied.
The time required to complete the injection molding process is called the molding cycle, also known as the molding cycle.The molding cycle directly affects labor productivity and equipment utilization, so the production process should be on the premise of ensuring quality, as far as possible to shorten the injection molding cycle at each relevant time.
A Kanban system is a means to achieve Just-in-time (JIT) production. It works on the basis that each process on a production line pulls just the number and type of components the process requires, at just the right time You can have JIT without Kanban But cannot have Kanban with JIT
the water vapor takes a short time
The Production Budget for Out of Time was $50,000,000.
The Production Budget for In Time was $35,000,000.