Bill of materials (BOM) is a list of the raw materials, sub-assemblies, intermediate assemblies, sub-components, components, parts and the quantities of each needed to manufacture a final product.
Bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor and their costs are itemized.
ihjghgjj
A bill of quantities is a list prepared by a quantity surveyor, of the quantities of materials needed for a specific project.
What is the difference between Invoice & Bill, in common terms. What is the difference between Invoice & Bill, in common terms.
No difference
difference between bill of exchange and promissory note?
A Material Takeoff is the process of analyzing(this includes list of materials with quantities and types,grades of materials and the weights of such materials) drawings and determining all the materials required to complete the design. A Bill of Materials is adocument that shows detailed desgriptions of materials used in completing a project,this includes,types of materials,specification of each item,gost of each item used,number and cost of labour used in completing the poject. The major difference between the two is:MTO is needed to make a BOM,a BOM aids in the procurement and requisition of materials.
what is different between bill and voucher
Bill of Lading Issued by carrier. Showing Consignee, Exporter, quantity of goods, Type of godds, etc. Bill of exchange Issued by exporter/shipper. Showing amount of goods. This used to exchange the shipping documents within shipper and buyer through bank.
what are the legal sihnificance of bill of quantity
A bill is flat where as a beak is curved.
i dont the answer
a bill is what you owe and a receipt is what you gave.
BILL USED A CIGAR