A transformer requires a 75-kVA minimum load in order to be set.
bride transformer
At a minimum, the main step up transformer for a generator should carry 105% of the full MW output of the generator.
The cost optimal algorithm in parallel computing is the modular structured parallel algorithm that satisfy the insatiable demand of low power consumption, reduces speed and minimum silicon area.
The plate should as a minimum show the working voltage, volt-amp capability and the rpm of the generator. Other optional information is the manufacturer and serial number.
A transformer requires a 75-kVA minimum load in order to be set.
A big one.
When the coil is parallel to magnetic field, torque is maximum. When the coil is in vertical position, the torque is minimum. You can't go beyond that.
bride transformer
10 ft.
200 lines minimum
At a minimum, the main step up transformer for a generator should carry 105% of the full MW output of the generator.
All transformers have a power rating given in kVA which determine the maximum load that can be connected to that transformer.
A megger would not be suitable for testing insulation resistance of a 13.2-kV transformer, as the transformer's voltage rating is significantly higher than the output voltage from a megger.
Two vectors are max when parallel and min when anti-parallel.
The transformer enclosure should isolate the transformer sufficiently from the environment. I believe OSHA specifies 2 feet, 1 inch as the minimum appoach distance to 13.8kV, so I suppose a transformer could be put this close to a building and still be safe. My guess is there are codes in place in your local area that prevent this and specify some greater distance.
Can be as little as you like.