Lump Sum ContractIn a lump sum contract, the owner has essentially assigned all the risk to the contractor, who in turn can be expected to ask for a higher markup in order to take care of unforeseen contingencies. Beside the fixed lump sum price, other commitments are often made by the contractor in the form of submittals such as a specific schedule, the management reporting system or a quality control program. If the actual cost of the project is underestimated, the underestimated cost will reduce the contractor's profit by that amount. An overestimate has an opposite effect, but may reduce the chance of being a low bidder for the project. Unit Price ContractIn a unit price contract, the risk of inaccurate estimation of uncertain quantities for some key tasks has been removed from the contractor. However, some contractors may submit an "unbalanced bid" when it discovers large discrepancies between its estimates and the owner's estimates of these quantities. Depending on the confidence of the contractor on its own estimates and its propensity on risk, a contractor can slightly raise the unit prices on the underestimated tasks while lowering the unit prices on other tasks. If the contractor is correct in its assessment, it can increase its profit substantially since the payment is made on the actual quantities of tasks; and if the reverse is true, it can lose on this basis. Furthermore, the owner may disqualify a contractor if the bid appears to be heavily unbalanced. To the extent that an underestimate or overestimate is caused by changes in the quantities of work, neither error will effect the contractor's profit beyond the markup in the unit prices. Cost Plus Fixed Percentage ContractFor certain types of construction involving new technology or extremely pressing needs, the owner is sometimes forced to assume all risks of cost overruns. The contractor will receive the actual direct job cost plus a fixed percentage, and have little incentive to reduce job cost. Furthermore, if there are pressing needs to complete the project, overtime payments to workers are common and will further increase the job cost. Unless there are compelling reasons, such as the urgency in the construction of military installations, the owner should not use this type of contract. Cost Plus Fixed Fee ContractUnder this type of contract, the contractor will receive the actual direct job cost plus a fixed fee, and will have some incentive to complete the job quickly since its fee is fixed regardless of the duration of the project. However, the owner still assumes the risks of direct job cost overrun while the contractor may risk the erosion of its profits if the project is dragged on beyond the expected time. Cost Plus Variable Percentage ContractFor this type of contract, the contractor agrees to a penalty if the actual cost exceeds the estimated job cost, or a reward if the actual cost is below the estimated job cost. In return for taking the risk on its own estimate, the contractor is allowed a variable percentage of the direct job-cost for its fee. Furthermore, the project duration is usually specified and the contractor must abide by the deadline for completion. This type of contract allocates considerable risk for cost overruns to the owner, but also provides incentives to contractors to reduce costs as much as possible. Target Estimate ContractThis is another form of contract which specifies a penalty or reward to a contractor, depending on whether the actual cost is greater than or less than the contractor's estimated direct job cost. Usually, the percentages of savings or overrun to be shared by the owner and the contractor are predetermined and the project duration is specified in the contract. Bonuses or penalties may be stipulated for different project completion dates. Guaranteed Maximum Cost ContractWhen the project scope is well defined, an owner may choose to ask the contractor to take all the risks, both in terms of actual project cost and project time. Any work change orders from the owner must be extremely minor if at all, since performance specifications are provided to the owner at the outset of construction. The owner and the contractor agree to a project cost guaranteed by the contractor as maximum. There may be or may not be additional provisions to share any savings if any in the contract. This type of contract is particularly suitable for turnkeyoperation.
User Avatar

Wiki User

13y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

13y ago

There are many different types, such as:

1. Design & Construct

2. 'Turnkey' (heavily overlaps with No. 1)

3. Cost Plus (Normally only used in extraordinary circumstances)

4. Target Cost (Often used in specialised construction e.g. chemical plants)

5. Partnering (Promotes teamwork and cooperation)

6. Alliancing (A more advanced form of partnering, parties agree not to sue each other and have a gainshare/painshare mechanism in place)

7. Construction Management

8. Minor Works

9. BOOT (Build Own Operate Transfer).

10. Various consultancy agreements for professional parties engaged e.g. architects, engineers.

That is just a few. There are a plethora of standardised suites (e.g. NEC, FIDIC) that are used around the world and each suite includes a number of different contracts to be used in different situations.

This answer is:
User Avatar

User Avatar

Wiki User

12y ago

work, law, cooking

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What are the types of contract in building construction?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Who can one contact about a building contract for a new home?

Construction Contracts, Construction Rocket Lawyer, and Home Advisor are all places where an individual can go in order to obtain a building contract for a new home.


What are types of external works in building construction?

External works around the building


What is nfpa 220?

NFPA 220: Standard on Types of Building Construction


What types of construction offer the strongest support for a building?

The use of steel to make pillars offers the strongest support for a building.


Is construction possible without cement?

no Yes. There are many types of building that do not use cement


What has the author Vincent Powell-Smith written?

Vincent Powell-Smith has written: 'Questions and answers on \\' -- subject(s): Examinations, questions, Law 'British constitution notebook' -- subject(s): Constitutional law, Outlines, syllabi 'Construction arbitrations' -- subject(s): Arbitration and award, Construction contracts 'A Contractor's guide to the JCT standard form of building contract (JCT 80)' -- subject(s): Joint Contracts Tribunal 'Contractors guide to the model conditions for the hiring of plant' -- subject(s): Construction equipment leases 'Know your contract cases' 'The law of boundaries and fences' -- subject(s): Boundaries (Estates), Fences, Law and legislation 'Tort notebook' -- subject(s): Compends, Torts 'Building contract dictionary' -- subject(s): Construction contracts, Dictionaries 'A Contract journal contractors' guide to the JCT Standard form of building contract 1980 edition' -- subject(s): Joint Contracts Tribunal 'Claims for negligence are on the increase' 'Problems in construction claims' -- subject(s): Breach of contract, Civil engineering contracts, Construction contracts, Contractors, Legal status, laws 'ACA form of building agreement 1982' -- subject(s): Association of Consultant Architects 'Contractors guide to the joint contract's tribunal's standard forms of building contract' -- subject(s): Construction contracts 'A protection handbook' -- subject(s): Great Britain 'Civil engineering claims' -- subject(s): Building, Civil engineering contracts, Contracts and specifications 'Contractors' guide to the JCT standard form of building contract, 1980 edition' 'Contractors' guide to the standard (non-nominated) form of building sub-contract'


What has the author Stephen Urban Rogers written?

Stephen Urban Rogers has written: 'An examination of the standard forms of building and construction contract'


Who pays court and lawyer fees when you are suing for a breach of contract in a building construction contract?

Losing party will pay some, but not all, costs. Each side is responsible for their own attorneys fees unless there is an attorneys fees provision in the contract.


What is a construction contract?

A construction contract can be explained as the warranty that ensures that the executed job gets the specific amount of compensation or the way compensation will be distributed. Moreover, a construction contract is negotiated specifically for the construction of an asset or a group of interrelated assets.


What are the components of construction contract software?

Construction contract software is often multifaceted and includes sections for both the business and payment aspect of the construction contract as well as the plans and human resources aspect.


What are the different types of maintenance systems regarding to building construction?

cement steel plan bricks plumber contracter


What are the kinds of electric circuits?

In the electrical trade there are three types of electrical circuits. They are series, parallel and series - parallel. All three types are used every day in building construction and home construction.