Want this question answered?
Entry into the Engineering and Manufacturing Development (EMD) phase is authorized by Milestone B, where the program receives approval to proceed from the Milestone Decision Authority (MDA) based on the program's successful completion of the technology development phase and achievement of key performance parameters.
Deployment and employment
Phases of COPAR 1. Pre-entry Phase 2. Entry Phase 3. Organizational Building Phase 4. Sustenance and Strengthening Phase 5. Phase Out
This phase is known as reset.
Industrial Operations set
It is test phase which is performed on production environment after product (feature, improvement, change request implementation, bug) is released to this environment. Post Production testing can be done only after all required testing is successfully finished on test environment. The objective of Post Production testing is to ensure that the deployment was performed correctly.
During the Initial Arrival Phase of a deployment, soldiers must Establish Manual Files. At the same time, issues important to survival (example: food, water, protection) are addressed.
Negative
All of the Above
1) Production and Deployment 2) Materiel Solution Analysis 3) Engineering and Manufacturing Development 4) Operations and Support
To develop, build, and test a product to verify that all operational and derived requirements have been met to support production or deployment decisions ACQ 1010 Mod 3.4 pg 7
Trained / Ready