answersLogoWhite

0


Best Answer

Product Baseline

User Avatar

Stefanie Little

Lvl 10
2y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

10y ago

what configuration baselines provides the details from which a contractor can transition from design to production of a system

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What configuration baselines provide the details from which a contractor can transition from design to production of a system?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Which of the following configuration baselines is used to define the overall system level capabilities of a system?

This is a programing software. It allows the user to design which requirements will need to be in place.


What are the primary configuration baselines?

Functional Baseline: initial specifications established; contract, etc.Allocated Baseline: state of work products once requirements are approvedDevelopmental Baseline: state of work products amid developmentProduct Baseline: contains the releasable contents of the project


How are baselines used to locate points on earths surface?

The Equator


How are these baselines used to located points on earths surface?

The Equator


Did roads run north and south?

Yes. Baselines run east and west.


Which of the principles related to updating project baselines are illustrated in this example?

-The approval of the board's request will lead to an increase in project scope -A change to the scope baseline will probably make changes to cost, quality, and time baselines necessary too


What two lines are the baselines for measuring distances on earths surface?

The equator, and the prime meridian.


What baselines would you include in a performance measurement baseline?

-Scope -Cost Performance -Schedule


Which baselines typically make up the performance measurement baseline?

Schedule Scope Cost


Which of the principles related to updating project baselines are applied in this example?

Jane should include undated baselines so that future project work can be accurately monitored and controlled Becasue the schedule the schedule is being increased in order to achieve the project's goals


You can start to build defenses for your information systems by creating security security?

By creating security "baselines"


What is foul territory is slow pitch softball?

Anything not inside the 1st and 3rd baselines and anything that hits home plate.