dick in the bum
It means acceleration.
A shield volcano is broad with gently sloping sides.
Limbs.
Because they are there home made roofs and they are kind of poor people in life so that is why they have sloping roofs
The main hazard associated with excavation work is the hazard of being caught in the excavation if it collapses. Soil assessment, sloping of trench walls, and policies on the use of ladders and strong trench wall supports and barriers have been developed to control this hazard.
That question has an answer that fills books. In a VERY brief answer, to have checked for underground hazards (wires, pipes) BEFORE starting to excavate, check for overhead hazards (powerlines) before starting, check for surface encumbrances (buildings, boulders, trees) that could be affected by the excavation- BEFORE starting. If a worker will enter an excavation more than 3 feet deep, a COMPETENT PERSON must inspect the excavation for hazards. The excavation must be protected from traffic, and from collapse. This is normally done by sloping, shoring or shielding.
dick in the bum
An excavation site is a location where systematic digging and exploration is conducted to uncover artifacts, fossils, or other important historical findings buried underground. It is commonly used in archaeology, paleontology, and construction projects to uncover and study the remains of past civilizations or creatures.
manual excavation
Yes. Negative gradient would mean downward sloping.
You mean italics?
Excavation to correct unsuitable sub-grades and embankment foundations and disposal of the excavated material. This defines the quantity of soil to be removed (organic, muck) and replaced.
sloping
A stepped strip foundation is often used on a sloping site where the steps allow the foundation to follow the slope without too much excavation, when compared with excavations and retaining walls. A floor structure that spans between perimeter strip foundations , whether over intermediate piles or not, also minimises excavation, when compared with a slab on grade or slab on fill floor.
It means acceleration.
If you are analyzing speed with respect to time, then you are decelerating.