WBM stands for Water Bound Macadam, and the term WBM road was derived in the memory of an engineer by name Macadam who designed and formulated this road section. This road is laid by binding the in-situ layers of boulders, stones, fine aggregates and fillers. The filler is made from the mixture of sand combined with either moorum quary dust, or soil that is avilable in that locality.

The filler is mixed with water and is used to fix stone boulders and the layers of coarse stones of varying sizes by compacting with a road roller to form the base of a road. The road can be used in this form itself.

As an improvement, you can apply concreting or black topping above the WBM to make it better.

Please see related link for the method of preparation a WBM road.

User Avatar

Nestor Heller

Lvl 10
2y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is “WBM Roads”?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What are the types of roads in India?

1)wbm road 2)bt road


What does wbm in text?

What about me


What is the Difference between WBM and WMM roads?

WBM (Water Bound Macadam) and WMM (Wet Mix Macadam) are used for Road construction in Base course layer. WMM is a new technology. difference between WBM and WMM can be summarized as below:Stone aggregate used in WBM is larger in size compared to WMM. In case of WBM its size varies between 45 mm to 90 mm depending upon the grade while in case of WMM aggregate size varies between 4.75 mm to 20 mmIn case of WBM stone aggregate, screening material and binders are overlaid one after another respectively at the time of construction. But in case of WMM, aggregate and binding materials are premixed in a batching plant or concrete mixing machine and then brought to site for overlaying and rolling.Materials used in WBM are stone aggregate, screening material (Kankar or murrum or smaller stone aggregate for filling up the voids ) and/or binding material (stone dust or Quary dust of PI not less than 6). materials used in WMM are Stone aggregate and binders (Stone dust or Quary dust of PI not less than 6)Quantity of WBM is generally measured in Cubic Meter while quantity of WMM is measured in Square Meter.


What is a full form of wbm in construction language?

water bound macadam


What is a WBM road?

WBM stands for Water Bound Macadam, and the term WBM road was derived in the memory of an engineer by name Macadam who designed and formulated this road section. This road is laid by binding the in-situ layers of boulders, stones, fine aggregates and fillers. The filler is made from the mixture of sand combined with either moorum quary dust, or soil that is avilable in that locality.The filler is mixed with water and is used to fix stone boulders and the layers of coarse stones of varying sizes by compacting with a road roller to form the base of a road. The road can be used in this form itself.As an improvement, you can apply concreting or black topping above the WBM to make it better.Please see related link for the method of preparation a WBM road.


What is the difference between wbm and wmm?

WBM (Water Bound Macadam) and WMM (Wet Mix Macadam) are used for Road construction in Base course layer. WMM is a new technology. difference between WBM and WMM can be summarized as below:Stone aggregate used in WBM is larger in size compared to WMM. In case of WBM its size varies between 45 mm to 90 mm depending upon the grade while in case of WMM aggregate size varies between 4.75 mm to 20 mmIn case of WBM stone aggregate, screening material and binders are overlaid one after another respectively at the time of construction. But in case of WMM, aggregate and binding materials are premixed in a batching plant or concrete mixing machine and then brought to site for overlaying and rolling.Materials used in WBM are stone aggregate, screening material (Kankar or murrum or smaller stone aggregate for filling up the voids ) and/or binding material (stone dust or Quary dust of PI not less than 6). materials used in WMM are Stone aggregate and binders (Stone dust or Quary dust of PI not less than 6)Quantity of WBM is generally measured in Cubic Meter while quantity of WMM is measured in Square Meter.WMM HAS MANY ADVANTAGES OVER WBM CONSTRUCTION1. SUPERIOR GRADATION OF AGGREGATES2.FASTER RATE OF CONSTRUCTION3.HIGHER STANDARD OF DENSIFICATION4.LESS CONSUMPTION OF WATER5. STRICTER STANDARD OF QUALITY ACHIEVABLE


Road?

A road is a thoroughfare route or way on land between two places that has been paved or otherwise improved to allow travel by foot or some form of conveyance including a vehicle, cart, bicycle, truck, and buses. Purpose of Road Classification A road network is composed of various types of roads, each of which performs a particular service in facilitating vehicular travel between points of trip origin and destination, and in providing access to the property. Road classification is the orderly grouping of roads into systems according to the type and degree of service they provide to the public. Classification of Roads 1. Based on Materials Earthen roads Gravel roads Murrum roads Kankar roads WBM roads Bituminous roads Concrete roads 2. Based on Location and Function National highways State highways District roads Rural roads or village roads 3. Based on Traffic Volume Light traffic roads Medium traffic roads High traffic roads 4. Based on Economy Low-cost roads Medium cost roads High-cost roads 5. Based on Traffic Type Pedestrian ways Cycle tracks Motorways 6. Based on Rigidity Flexible roads Rigid roads 7. Based on Topography Plain area roads Hilly area roads Factors Affecting Classification of Roads Many different classification systems have been introduced and used for a particular purpose. The basis for some of these classifications are: Legal control Surface type Function Geometric elements Location Traffic volume


Which is the best site for online shopping in pakistan?

BuyZilla.pk is the top online shopping site in Pakistan that offers 100% original brands at amazing discounts. Whether you’re looking for unstitched material or ready to wear designs, jeans and a top or everyday essentials for your kids, or even new bedsheets and cushion covers for your room, they’ve got it ALL!


Why are roads called roads?

Because they are roads.


How was distance marked on Roman roads?

Distance was marked on Roman roads by milestones.Distance was marked on Roman roads by milestones.Distance was marked on Roman roads by milestones.Distance was marked on Roman roads by milestones.Distance was marked on Roman roads by milestones.Distance was marked on Roman roads by milestones.Distance was marked on Roman roads by milestones.Distance was marked on Roman roads by milestones.Distance was marked on Roman roads by milestones.


What is the plural of roads?

The plural of road is roads


What is meant by roads crossing roads?