CT (current transformer) Burden is the maximum load that the CT secondary can drive (e.g. meters or protection relays)
Why do you care about burden when ordering current Transformers?
The burden is the termination impedance of the measuring instrument. The measuring instrument can be an analog or digital energy meter, a data logger or a recorder. All instruments that use a current transformer to measure line current must terminate the CT with a resistance (impedance in same case which means there is some inductance involved).
A CT supplier should be given the burden when ordering. Technically, the total burden for a CT is the internal winding resistance, the connecting lead resistance and the measuring instrument input resistance.
Some Ct's are installed a long distance from the measuring instrument and the connecting leads can have a resistance as much as 0.002 ohms per foot (both ways because the current makes a complete round trip). This resistance will cause an error if not taken into account.
use of integration in electrical engineering
In electrical engineering, shunt means 'parallel'.
Electrical engineering is low voltage, logic circuits, communications etc. Power engineering is electrical transmission and the like.You want EE.
To become electrical engineer
yes i need different symposium name for electrical and electronics engineering
This is not understandable. Please rephrase and resubmit. Be specific
use of integration in electrical engineering
In electrical engineering, shunt means 'parallel'.
NO, EEE is better then the electrical engineer
electrical engineering and computer engineering
Electrical Engineering.
The main conclusion is that Electrical Engineering is a good thing.
Electrical engineering is low voltage, logic circuits, communications etc. Power engineering is electrical transmission and the like.You want EE.
electrical engineering and computer engineering
To understand and practice the Electrical engineering and finally become a good Electrical Engineer.
Yes, as long as the burden of these ammeters does not exceed the VA rating of the CT.
After doing electrical engineering go and stone the neighbors mango tree