Document changes that include revised text because of a change
The main deliverable from the analysis phase is the Requirements Specification document. It is a living document that needs to be revised as the requirements change during the prototyping and development activities.
Functional Annexes
Basic Plan
Basic Plan
Basic Plan
The basic plan.
observations change.
yes, because its always subject to change
It is still an Excel spreadsheet. The workbook does not change, just because it is linked to another document to form a compound document.
Yes they do.
he revised the draconian laws
Extremophiles, organisms that thrive in extreme environments, are less likely to be revised because they have adapted to very specific or harsh conditions over time, making it difficult for them to change without significant evolutionary pressure.