The main deliverable from the analysis phase is the Requirements Specification document. It is a living document that needs to be revised as the requirements change during the prototyping and development activities.
deliverable
"What process adaptations are required if the prototype will evolve into a deliverable system or product?"
"What process adaptations are required if the prototype will evolve into a deliverable system or product?"
How can you select the system plan in system analysis?
close system are the type of system that do not interact with the environment
how can i define a library system analysis???? how can i define a library system analysis????
system analysis and design
how to write system analysis proposal
NOTHING...
Milestone - A significant point (or event) in the life of a project. Deliverable - Any item that is passed on to the End-user or customer as part of the project. Difference: Acquiring the team to do the project is a milestone but the work done by that team will be a deliverable
menu analysis system
whatever the the size of company, big or small.... the feasibility analysis and requirement analysis is the central part of system analysis.