The main deliverable from the analysis phase is the Requirements Specification document. It is a living document that needs to be revised as the requirements change during the prototyping and development activities.
deliverable
"What process adaptations are required if the prototype will evolve into a deliverable system or product?"
How can you select the system plan in system analysis?
"What process adaptations are required if the prototype will evolve into a deliverable system or product?"
close system are the type of system that do not interact with the environment
how can i define a library system analysis???? how can i define a library system analysis????
system analysis and design
how to write system analysis proposal
menu analysis system
whatever the the size of company, big or small.... the feasibility analysis and requirement analysis is the central part of system analysis.
NOTHING...
Milestone - A significant point (or event) in the life of a project. Deliverable - Any item that is passed on to the End-user or customer as part of the project. Difference: Acquiring the team to do the project is a milestone but the work done by that team will be a deliverable