Milestone - A significant point (or event) in the life of a project.
Deliverable - Any item that is passed on to the End-user or customer as part of the project.
Difference: Acquiring the team to do the project is a milestone but the work done by that team will be a deliverable
the difference in critical and non critical task in a system is critical task are processes that the computer needs to operate correctly they are must have programs. Non critical talk are task that are running or can run but is not a crusial part if the task is deleted or ended then the OS should still fuction properly
A problem is a task or situation that needs to be solved, while an algorithm is a step-by-step procedure for solving a problem. Understanding this distinction helps in choosing the right approach for problem-solving. By recognizing the difference, individuals can apply appropriate algorithms to efficiently and effectively solve problems.
There is no distinction between a USB 1.1 and a USB 2.0 cable. A USB cable can be operated at either speed. If I took an A to B USB cable from 1995, I could use it with the newest devices on the market with no problem.
Critical path method - This is the schedule network analysis technique used to identify the schedule flexibility and the critical path of the project schedule network diagram. The critical path is the longest path (sequence of activities) in a project schedule network diagram. Because it is the longest path, it determines the duration of the project and hence the finish date of the project given the start date.The second important feature of the critical path method is to identify the flexibility in the project schedule by calculating the early and late start and finish dates of each activity on each path. The schedule flexibility of an activity is measured by the positive difference between the late start date and the early start date for the activity and is called float time or total float.Without a proper Critical Path Analysis, an efficient Schedule for the Project cannot be created
A routine is a set of actions or behaviors that are regularly followed, while a procedure is a specific set of steps to accomplish a task. Understanding this distinction can improve efficiency by helping individuals identify the most effective way to complete tasks and streamline processes. By clearly defining procedures within routines, individuals can eliminate unnecessary steps and reduce errors, ultimately saving time and increasing productivity.
Milestone and deliverableA milestone is a scheduled event signifying the completion of a major deliverable or a set of related deliverables. A milestone has zero duration and no effort -- there is no work associated with a milestone. It is a flag in the work plan to signify some other work has completed.Usually a milestone is used as a project checkpoint to validate how the project is progressing and revalidate work. Milestones are also used as high-level snapshots for management to validate the progress of the project. In many cases there is a decision to be made at a milestone.Deliverable is a term used in project management to describe a tangible or intangible object produced as a result of the project that is intended to be delivered to a customer (either internal or external). A deliverable could be a report, a document, a server upgrade or any other building block of an overall project. The word is considered corporate jargon.A deliverable may be composed of multiple smaller deliverables. It may be either an outcome to be achieved or a product to be provided
The critical point on a phase diagram is located at the intersection of the liquid-vapor phase boundary and the critical temperature line. At this point, the distinction between liquid and vapor phases disappears.
deliverable volume is for liquids while minimum fill would be for semisolids.
»The supercritical technology is nothing but the thermodynamic where there is no clear distinction between the Water and Steam phase in the Rankine Cycle•Water reaches to steam state at a critical pressure above 22.1 Mpa.
The critical temperature of CCl4 (carbon tetrachloride) is 283.5°C and the critical pressure is 45.6 atm. At the critical point, the distinction between liquid and gas phases of CCl4 disappears, and it behaves as a supercritical fluid.
The triple point is the temperature and pressure at which a substance can exist in all three phases (solid, liquid, gas) simultaneously. The critical point is the temperature and pressure at which the distinction between liquid and gas phases disappears.
The critical point of the phenol-water system occurs when the temperature and pressure reach the critical values at which the distinction between liquid and gas phases disappears. At this point, the properties of both phases become indistinguishable, leading to a critical point that represents the maximum temperature and pressure at which the two phases can coexist.
why is the distinction between insurable and uninsurable risks is significant for the theory of profit
NO
A cell wall is the primary distinction between plant and animal cells.
The major distinction in this system is between consumer and industrial products.
The distinction between the KTSs and PBXs became more blurred as technology brought more intelligence to the KTS