poll, pole
A homophone of "take a survey" is "take a surrey" (a type of horse-drawn carriage). A homophone of "a long cylinder" is "a long silinder" (a misspelled version of cylinder).
The homophone for "take a survey" is "tapered" and the homophone for "a long cylinder" is "a long seller".
"Take a survey" sounds like "take a sirvey."
The homophone that means "take advantage of" is "seize."
The homophone of "he'd" is "heed," which means to pay attention to or take notice of something.
The word is steal meaning to take something that does not belong to you.
The homophone for "take a survey" is "tapered" and the homophone for "a long cylinder" is "a long seller".
poll, pole
poll, pole
Perhaps your answer is "poll" and "pole".
"Take a survey" sounds like "take a sirvey."
The time it takes to get results from a seismic survey can vary depending on the size and complexity of the survey. Generally, it can take anywhere from a few weeks to a few months to process and interpret the data collected during the survey.
Master Brake cylinder replaced and lines bled-how long?
The homophone that means "take advantage of" is "seize."
It will take 5,104.1 gallons of water to fill this cylinder.
4 cylinder is .7 hrs - 6 cylinder is .5 hrs
In survey we take survey at limited excess but in 360 degree survey we take a lot of surveys in a day. yes you need 360 degree survey for best result in some causes that if your company do not gave you survey due to some region so you need this
5 minutes :>