get someone else to do it
Load divided by area of load applied (Load per unit area)
Main reinforcements take the load
The top layer of concrete is called the structural coat. It directly receives the most load which must then be transferred to lower layers.
Mass concrete foundations are economical where the side of the excavation can be used as a shutter and where suitable depth of mass can be accommodated to disperse the load without the need for reinforcement.
The noun form 'the load' is a singular, common noun; load is both a concrete (a load of bricks) or an abstract (a load of guilt) noun, depending on use. The word load is also a verb (load, loads, loading, loaded).
get someone else to do it
Creep is what happens when concrete changes form because of pressure or load on the concrete. It can occur immediately or long term.
Load divided by area of load applied (Load per unit area)
m20 grade concrete per m3 load
wat load the cocret sequor meter can care on top
It's d ratio of compressive load given to d concrete face to d area of concrete face:)
Most concrete delivery companies have a minimum order like 4 yards in most states. Anything under 4 yard minimum they charge you a short load charge. Here in New York one yard of concrete can cost you over $400 bucks.. You need to find a short load company that has small mixers to save money. Or rent a trailer. I build mini mixers see minimaxconcrete.com
elephant
some concrete trucks can carry up to 12yards of ready mix concrete. But most times they keep it under 10 yards per load.
The standard concrete building block for load-bearing walls is 8 x 8 x 16
focuses on concrete.