Piles are used in foundations to give a better base for structures. The appropriate pile cut-off level is commonly around 75mm above the underneath of the pile cap.

User Avatar

Wiki User

9y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is cut-off level in pile foundation?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Computer Science

How do you drive in bakau pile?

Bakau pile can be pile into the ground by using the excavation arm of a 20 tons excavator to press into the ground.


What are short board pile foundation?

if its what i think it is , a pile is used as a deep foundation support for a building structure for use on soft ground to give solid support for the new building to "rest" on , short and deep piles are used by a drilling rig and filled with steel cages and concrete and then the pillars of the structure are set onto them , hope this helps im sure you meant SHORT BORE , the smaller and lighter the building the smaller piles that are needed (think of a 4 legged chair the legs being the piles the seat being the building and hey presto).


Does amtrak have wi-fi?

pile of butts


How long to make tech sergeant?

Once you made the cutoff and your line number comes out.


What does a 6633N SAP 10-50 CCMS mean?

6633N SAP 10-50 GC/MS is a Quest Labs designation for a standard urinalysis which tests for cannabinoids, amphetamines, opiates etc. There is a 50ng/ml drug/metabolite cutoff level for the initial immunoassay screening with a 15ng/ml confirmation cutoff using Gas Chromotography/Mass Spectrometry (GC/MS) method. Only specimens which fail the initial immunoassay screening, referred to as "presumptive positives", are sent for GC/MS confirmation at the more sensitive level. During the initial immunoassay screening, tests for validity such as specific gravity, creatinine level, alduterant (additive) checks etc. nare performed to ensure that the specimen has not been tampered with and is actual human urine. If a specimen passes intitial screening a "pass" is reported and no further testing is performed.

Related questions

What is cut off level in pile foundation?

Piles are used in foundations to give a better base for structures. The appropriate pile cut-off level is commonly around 75mm above the underneath of the pile cap.


What are the advantages bored pile foundation?

. The advantage of bored piling is its' drilling method, little vibration and lower noise level.


What is the formula for calculating volume of Bulb in the pile foundation?

concrete qty for bulb portion in pile foundation


How many types of foundation?

types of foundation....1. shallow foundation 2. deep foundation 3. pile foundation


Can you use pile foundation on existing foundation?

There are various reasons such as: 1) Its not possible because pile foundation are designed for 2) Particular life cycle and its specially depends on ground conditions of soil properties. 3) Pile foundation is one part of major foundation in construction where life cycle is required more with another reason are pile foundation is used for which type of structure its also important factor considering time of design. 4) One another major factor is settlement of existing pile foundation is in specific limits or not. Also so many reasons etc. Thanks & Regards HARSHAL.S.KHODE Deputy Manager (QA/QC)


Is pile foundation applicable only in soft soil?

It does not meant that pile foundation is only applicable for soft soils alone. For other type of soils it will not be much economical.


How do you prevent dampness in Pile foundation?

By placing a plastic vapor barrier before casting the foundation


What is elisa cutoff and gcms cutoff?

The absorbance level assumed to be the limit for positive samples


What is sbp in foundation?

It might be Short-board pile ;D


How much a minimum distance form pile center to the edge of foundation be required?

1.5 times of dia of pile.


Can you list types of foundation in building?

Matt or Raft Foundation Combined Footings Pile Cap Foundations Isolated Foundations Continous Foundation


Why a pile raft foundation?

If the soil is so lose that it cant hold the building even with pile foundation. So, piled raft foundation is used which make the building to float like a boat. That obeys Archimedes' principle-it is buoyed up by the weight of the earth displaced in creating the foundation.