An overview of the hydro turbine governor will be given. The idea of the governor was first treated

analytically by Clark Maxwell in the 19th century. Governor action was correctly seen as something

very important in the days when hydro plants were installed as the sole or the principal contributor to a

small power system. As large interconnected systems developed, the large number of loads and

generators obscured the action of the governor. Less interest was taken in how the governor should be

specified and adjusted for use in a large interconnected system. However, mysterious power flows

began to be seen in generation areas where the generation was predominantly hydro. This led to

governor setting policies, which are valid today. Now, we have the ability to build very large computer

models and to demonstrate the significance of the governor. In addition, it has been demonstrated that

the computer models may indicate that a system is robust, while real life experience shows that the

system has collapsed. This anomaly has been explained by inadequate representation of the hydro

turbine and its governor. It is now a requirement of the System Operator that hydro power plant

owners submit data that will allow realistic models to be developed for inclusion in system models.

This tutorial is intended to prepare engineers, as well as practitioners of other profiles and students

interested in the hydro power generation, to understand the operation of governor and to describe the

control system and the hydro turbine governor control parameters.

John Codrington received his B.Sc. (Hons) in Mechanical Engineering from University of Manchester,

England in 1964. He has been with Acres, and now Hatch Energy, for 43 years and has contributed to

many different projects. His most recent experience has been in hydroelectric engineering, much of

this being in Latin America and Iran. He made a major contribution to the conceptual work and was

responsible for the specifications for the Pelton turbines and the gates for the San Gaban hydroelectric

project, Peru. He contributed to a proposed high head Pelton station in Guatemala, making

recommendations to deal with hydraulic transients. He was more recently assigned overseas to work

on the 2000 MW Karun III project in Iran, where he was responsible for the design review of all

mechanical equipment including the Francis turbines, the governors, the gates in the high head arch

dam, and other equipment in the powerhouse. He participated in the shop testing of the governor,

where a feedforward algorithm requested in the specifications was coded in and successfully tested in

the course of the shop testing. He has participated in studies dealing with dynamic problems and

frequency regulation at a hydroelectic plant supplying a mining and smelting operation in Indonesia.

He has a strong background in analysis of transients in pumping installations and hydro plants.

He prepared a computer model to investigate the dynamic behaviour of the interconnected electrical

system following a proposed intertie between Kenya and Tanzania. This model was focussed on prime

mover control and investigated how the system and the proposed tie lines responded to load changes.

Mr. Codrington prepared technical specifications and participated in procurement of hydro turbine

governor systems for major projects such as Churchill Falls, Labrador, Akosombo in Ghana, and Karun

III in Iran. In each of these cases, special demands were made on the governor systems and special

features were specified.

He recently participated in studies for the Blue Lake project for the City of Sitka, where a preliminary

surge tank configuration was developed and estimates were made of the local power system frequency

response to load demand changes. A customized computer model was prepared to analyze the response

of the electrical system to demand changes.

Mr. Codrington is a registered Professional Engineer in the province of Ontario, and a Life Member of

the American Society of Mechanical Engineers (ASME).

Related Representative Publications

• "Hydroelectric Turbine Regulation Criteria", Presented at ASME Winter Annual Meeting,

Anaheim, California, Publication FED-Vol. 136, November 1992.

• "Computer Representation of Electrical System Interaction with a Hydraulic Turbine and

Penstock", Joint Power Generation Conference, St. Louis, Missouri, 1981. (Coauthor)

• "The Use of Impedance Concepts and Digital Modelling Techniques in the Simulation of

Pipeline Transients", Presented at the 2nd International Conference on Pressure Surges,

London, England, September 1976. (Coauthor)

User Avatar

Wiki User

12y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is hydroelectric power plant governor?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is one situation where gravitational potential energy might be useful?

For example, in a hydroelectric power plant, where it is converted into electricity.For example, in a hydroelectric power plant, where it is converted into electricity.For example, in a hydroelectric power plant, where it is converted into electricity.For example, in a hydroelectric power plant, where it is converted into electricity.


When was Dubrava Hydroelectric Power Plant created?

Dubrava Hydroelectric Power Plant was created in 1989.


When was Čakovec Hydroelectric Power Plant created?

Čakovec Hydroelectric Power Plant was created in 1982.


When was Smuggler-Union Hydroelectric Power Plant created?

Smuggler-Union Hydroelectric Power Plant was created in 1907.


What is better hydroelectric power plant or nuclear power plant?

hydroelctric


The hydroelectric of a what power plant is turned by moving water?

turbine power plant


How is hydroelectric power is a usable energy?

hydroelectric power is an important for producing the power in the low loss of energy..energy is nothing but producing the power....so we can easily produce the power from hydroelectric power plant.


How many people does it take to run a hydroelectric power plant?

to run one hydroelectric power plant it needs about 1000000000000000000000000000000000000000000000000000000000212212200 people to run it.


Hydroelectric power plant in Luzon?

ewan ko


What uses Hydroelectric power?

Hydroelectric power plants. They have dams and generators. Water flows through a dam, which spins generators that produce hydroelectric electricity. (Fun Fact: The Hoover Dam is the biggest hydroelectric power plant.)


Show picture of hydroelectric power plant in a diagarm form?

HYdroelectric power is pretty cool and here is a diagram:


What power plant are located in rivers dams and waterfalls?

hydroelectric