It's a case two.. in which a slab has three continuous sides (i.e. three sides are followed by other slabs ).
Drill out the edge of the slab and add some dowels....or cut the slab back.
Pouring a concrete slab is the pouring of a fresh unset concrete mix into a prepared area, where it is finished by floating etc to give the required surface, and it sets to form a slab.
The basic difference between one way and two way slab is load distribution which is depends on support condition and span lengths.Mainly shorter span is carring larger load than longer span.This load distribution can be calculated considering the deflection at any point is same Shorter and Longer Span.
what is a ytransfer slab
Slab 15mm
Drill out the edge of the slab and add some dowels....or cut the slab back.
Just one more slab of bacon, please... That slab of concrete is sliding dangerously close to the edge of the cliff.
A stauchwall is the bottom, or downhill, edge of a slab avalanche's crown area. It marks where the snow rolls over and slides.
convection
slab pull .(:
when the length of the slab is more or equal to twice the breadth hence it has to be one way slab.
A slab panel, bound on its two long sides by beams and on its two short sides by girders.
Pouring a concrete slab is the pouring of a fresh unset concrete mix into a prepared area, where it is finished by floating etc to give the required surface, and it sets to form a slab.
Slab pull means the movement of tectonic plates due to currents in the mid-mantle, this causes subduction.
Concrete slab
Supended slab are slab not sit on the ground directlySuspended slab is a slab supported by beams.
convergent boundary