answersLogoWhite

0

What is mean by prefabrication?

User Avatar

Anonymous

13y ago
Updated: 8/20/2019

*Prefabrication* is the practice of assembling components of a structure

in a factory

or othermanufacturing

site, and transporting

complete assemblies or sub-assemblies to the construction

site where the structure is to be located. The term is used to distinguish this process from the more conventional construction practice of transporting the basic materials

to the construction site where all assembly is carried out.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

When did the modern concept of prefabrication begin?

The modern concept of prefabrication, which mass produces uniform panels and components, dates back to the early 1900s.


What is prefabrication?

A bridge ramp that can go up or down.


How were the Stonehenge build?

By the use of sophisticated geometric design and prefabrication techniques.


What has the author Eva Harrison written?

Eva Harrison has written: 'Prefabrication'


What are the disadvantages of prefabrication?

THIS IS NOT GOOD FOR ENGINEERS WHO CHANGES HIS MIND EVERYDAY AND ALL THE PROVISIONS FOR ALL SERVICES WILL BE AFFECTED.


What are the synonyms of the word construction?

Architecture, assembly, build, conception, development, fabrication, manufacture, prefabrication and erection are all synonyms of the word construction.


Need for Prefabrication?

cost of construction shorter construction time easy of expansion utilisation of material attractive finishes highly efficient for weather resistence single source assurance insurance advantage


What does building method mean?

A building method refers to the specific techniques and processes used in the construction of a structure. This can include various approaches such as traditional masonry, prefabrication, or modular construction. Each method has its own advantages and disadvantages, influencing factors like speed, cost, and sustainability. Ultimately, the choice of building method impacts the overall efficiency and quality of the construction project.


What does prefabricated in line 19 mean?

In line 19, "prefabricated" refers to components that are manufactured in a factory setting before being transported to a construction site for assembly. This method allows for greater efficiency, reduced construction time, and often improved quality control compared to traditional building methods, where materials are assembled on-site. Prefabrication can apply to various building elements, such as walls, roofs, or entire modular units.


When re-constructing the globe theatre the builders use a method pre-fab what does it mean?

Prefabrication, or pre-fab, refers to the practice of assembling building components in a factory or off-site before transporting them to the final location for installation. In the context of reconstructing the Globe Theatre, it means that parts of the structure were manufactured in advance to ensure precision and efficiency, allowing for quicker assembly on-site. This method can enhance quality control and reduce construction time.


What does manufacture mean?

man·u·fac·tureˌman(y)əˈfak(t)SHər/nounnoun: manufacture1. the making of articles on a large scale using machinery."the manufacture of armored vehicles"synonyms: production, making, manufacturing, mass-production, construction, building, assembly, creation, fabrication, prefabrication, processing "the manufacture of aircraft engines"a specified branch of industry. "the porcelain manufacture for which France became justly renowned"manufactured goods or articles. plural noun: manufactures"exports and imports of manufactures"


WHAT ARE THE ELEMENTS FOR PREFABRICATION?

The prefabrication structure of building components can significantly increase construction if it is carried out in an organized way. The main advantage is that systems and components require time and labor to complete and are scheduled for short installation times. Much of the equipment and fixtures in a typical building are prefabricated, such as casework, mechanical equipment, electrical equipment, and more. Much more is partially prefabricated, such as trusses for roofs or bar joists and structural steel, which is precut, partially assembled, and detailed with anchor bolt layouts or other critical measurements provided by the supplier. Disadvantages come when prefabricated structures don’t fit right, and it becomes difficult to transport from the fabrication location. Also, some components might get damaged in handling or shipping, or they may not be built correctly. It is common, for instance, for a structural steel beam to have a connection plate welded to it at the wrong elevation or on the wrong site. Still, careful, accurate detailing and fabrication can avoid this problem.