Plant capacity is the maximum amount of production for a specific production facility.
Line balancing occurs within a plant with multiple production lines. Resources may be moved between production lines in order to achieve the right mix of finished products. For example, for each car body produced other lines may produce four wheels, two seats, two tail lights, etc. so that final assembly will have available the right mix of parts. Producing extra doors, for example, will not increase total plant output for the day and may result in storage problems which line balancing would have prevented.
Capacity is the ability often related to production. Undercapacity would mean that the organization can increase their output without adding on to their facility. For example, an auto parts plant may have the capacity to produce 100 parts per hour, but currently only running 80 parts per hour. They could increase their capacity without any major changes to their plant.
dividend balancing means dividend due to foreign partner in foreign exchange have to be matched with foreign exchange earnings i.e income from exports.
Under the self-balancing system, it is possible to construct a complete trial balance from each ledger, debtors ledger, creditors ledger
cash balancing
when a capacity is fixed
for thrust balancing.
[object Object]
The balancing line is a transmission line consisting of two conductors of the same type, that are grounded to the compressor's circuits and to the ground and helps keep external noise down.
you need a balance
Boiler feed pump's suction pressure be aprox. 15Kg/cm2 and discharge pressure be 180Kg/cm2. So the balancing line balance the pressure and protect the boiler feed pump. my quastion is that what is the working principal of balancing leak off
The balancing of a transportation model involves ensuring that total supply equals total demand for all products and destinations. If the transportation model is unbalanced, meaning supply does not equal demand, the remedy involves adding a dummy source or destination to balance them out. This dummy source or destination is assigned a cost of zero to maintain the overall balance of the transportation model.
The same way it flies if you are not transporting a plant, by carefully balancing lift, weight, thrust and drag.
in nature, decaying plant parts add nutrients to soil, while plant roots take some nutrients out of the soil.
From the little detail you provide I assume you are referring to the Condensate extraction pump vents. These must return to the condenser from high points to ensure line is liquid filled and causes minimum pressure loss to the pumps. NPSH available to CEP is very small and must all be used if full capacity is to be obtained. Leaving valve open is not a problem provided both halves of condenser are in use.
Armin Scholl has written: 'Balancing and sequencing of assembly lines' -- subject(s): Assembly-line balancing, Planning, Assembly-line methods, Data processing, Heuristic programming, Production planning, Production scheduling
In boiler feed pumps usually the discharge pressure is 20 to 30 times tie suction Pressure so to protect the pump balancing line is given from discharge to suction.
Nominal capacity is the rate at which the parties involved would like for the plant to operate. Design capacity is the rate at which the designers have engineered the plan to operate.