The preliminary work is to clear the site of vegetation and other obstructions. Any ground levelling is also done, then the foundation trenches are marked out.

User Avatar

Wiki User

10y ago

What else can I help you with?

Related Questions

What are the preliminaries in construction?

preliminaries are the associated costs that contractors incur in the completion of a project, for example the cost of hoarding or a site office, or heating the site office, (rather than the costs of the actual building work , e.g. the bricks, blocks)


What is preliminaries in BOQ?

road preliminaries?


What is the purpose of preliminaries?

the purpose of prelims is to make money for people on the site, so they can make coffee and tea and hot chocolate


How does a construction firm deal with preliminaries?

based on their previous projects' actual preliminaries


What are list of building preliminary items?

Building preliminaries involves site investigation,access road,site clearance,feasibility study etc before the actual construction begins.


What is included in construction preliminaries?

Construction preliminaries refer to the initial costs and activities necessary to prepare for a construction project. This typically includes site setup, temporary facilities, project management expenses, insurance, and permits. Additionally, it encompasses utilities, safety measures, and the mobilization of labor and equipment. Overall, preliminaries are essential for ensuring that the project can proceed smoothly and in compliance with regulations.


What types of preliminaries work for 20 stories building?

site clearance, hoarding, site access,security,insurance,transportation,statutory requirements, main entrance,site accomodation, storage facilities,welfare facilities, scaffolding,communication networks, signboard, water supply, power supply, sanitation, site safety, siting of plant and equipment,health facilities.


What are 20 list of Preliminaries items?

Preliminaries in a project or construction context typically include items that set the stage for the main work. A list of 20 preliminaries items might include: Site preparation and clearing Temporary site facilities Utilities connections Safety measures and signage Temporary fencing Environmental controls Insurance and bonds Permits and approvals Site drainage systems Access roads and pathways Waste management plans Construction scheduling Site security measures Temporary power supply Water supply arrangements Material storage areas Communication systems Labor facilities (e.g., rest areas) Traffic management plans Quality control procedures These items ensure that a project is set up efficiently and safely before the main construction begins.


What is project overhead costs?

It is all the cost that is associated to a proper running of site but not directly related to the construction.ORThe site cost of administering a project and providing general plant, site staff, facilities and site-based services.Project overheads are priced in the preliminaries section of bill of quantities and will include items such as supervisory labour, Site office.


What is the plural of preliminary?

The plural of preliminary is preliminaries.


What is constriction?

constriction is one part of the thermometer that has like a hill


What are the release dates for Letter to Loretta - 1953 The Preliminaries 8-22?

Letter to Loretta - 1953 The Preliminaries 8-22 was released on: USA: 19 March 1961