The preliminary work is to clear the site of vegetation and other obstructions. Any ground levelling is also done, then the foundation trenches are marked out.
preliminaries are the associated costs that contractors incur in the completion of a project, for example the cost of hoarding or a site office, or heating the site office, (rather than the costs of the actual building work , e.g. the bricks, blocks)
road preliminaries?
the purpose of prelims is to make money for people on the site, so they can make coffee and tea and hot chocolate
based on their previous projects' actual preliminaries
Building preliminaries involves site investigation,access road,site clearance,feasibility study etc before the actual construction begins.
Construction preliminaries refer to the initial costs and activities necessary to prepare for a construction project. This typically includes site setup, temporary facilities, project management expenses, insurance, and permits. Additionally, it encompasses utilities, safety measures, and the mobilization of labor and equipment. Overall, preliminaries are essential for ensuring that the project can proceed smoothly and in compliance with regulations.
site clearance, hoarding, site access,security,insurance,transportation,statutory requirements, main entrance,site accomodation, storage facilities,welfare facilities, scaffolding,communication networks, signboard, water supply, power supply, sanitation, site safety, siting of plant and equipment,health facilities.
Preliminaries in a project or construction context typically include items that set the stage for the main work. A list of 20 preliminaries items might include: Site preparation and clearing Temporary site facilities Utilities connections Safety measures and signage Temporary fencing Environmental controls Insurance and bonds Permits and approvals Site drainage systems Access roads and pathways Waste management plans Construction scheduling Site security measures Temporary power supply Water supply arrangements Material storage areas Communication systems Labor facilities (e.g., rest areas) Traffic management plans Quality control procedures These items ensure that a project is set up efficiently and safely before the main construction begins.
It is all the cost that is associated to a proper running of site but not directly related to the construction.ORThe site cost of administering a project and providing general plant, site staff, facilities and site-based services.Project overheads are priced in the preliminaries section of bill of quantities and will include items such as supervisory labour, Site office.