Q: What is prioritizing on time constraints an example of?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Industrial Engineering

How is a geometric constraint different from a numeric constraint?

Dealing with engineering or CAD, a geometric constraint deals with constraints such as parallel or perpendicularity. A numeric constraint deals with distances and size. Width, length, and depth are examples of these.--------Geometric constraints are constant, non-numerical relationships between the parts of a geometric figure. Numeric constraints are number values, or algebraic equations that are used to control the size or location of a geometric figure :)


What three types of constraints can be applied to CAD sketchs or models?

Geometric Constraint, Parametric Constraint, and Assembly Constraint


What is the example of Just in time manufacturing?

something that is made just in time to be sold or realsed.


What is manufacturing cycle efficiency?

Manufacturing Cycle Efficiency is value add (VA) time divided by non-value add(NVA) time. That is, in the entirety of a process flow or value stream flow, the total of value added time divided by the total of non-value added time. For example, total manufacturing cycle time of 28 days. Of the total, let's say there is 1 day worth of VA time and 27 days of NVA time. That means your cycle efficiency comes to 3.7%.


What are different numeric constraints?

a constraint that deals with the complexity of an object.a constraint that deals with numbers and shapes.a constraint that... oh I don't know.lol i just made this all up.A constraint that can be described by a number value etc... 5 feet long, three inches tall

Related questions

What is the example of prioritizing?

Prioritizing is simply the process of deciding which of your tasks require the most of your attention and then forming a list with the most important things to take care of on top.


What are constraints in an engineering project?

The constraints in an engineering project include scope, time, quality and budget.


What are the common constraints to any project and why are they called constraints?

Common constraints in a project include time, cost, scope, and quality. They are called constraints because they limit the project's flexibility and resources. Effectively managing constraints is critical to the success of a project.


How do you use the word 'time constraint in a sentence?

He should adhere to the time constraints.


How do you use the word 'time-constraint in a sentence?

He should adhere to the time constraints.


What kind of prioritization is done on time constraintS?

simple prioritization


What is the difference between time constraints vs time restraints?

time constraints basically means lack of time or shortage of time to do a particular task or activity. time restraints means a situation where one is unable to reach a specified goal set earlier, on account of time shortage.


What is project constraint?

The primary constraints are scope, time, quality and budget.


What does constraints mean?

limitation or restriction.


What is cultural constraints?

Cultural constraints are societal norms placed on different genders, races, and cultures based on how society thinks they should act. For example, a woman is expected to "carry herself like a lady."


Which of the following is not a variable to determine which repair method to use?

unlimited time constraints


Use in a sentence with the time constraint?

Again, we appreciate your patience and cooperation as we work against these critical time constraints