To convert breaking strain to safe working load you must establish a safety factor (SF). Assume SF of 10. If a line has a breaking strain of 1 tonne then you should only suspend or load the line to a strain of 100Kg (1000Kg/10) A common SF for normal use is 6. If human loads are in use then SF 10 is more common.
load in terms of any electrical machine is of 3 types mainly :- 1)resistive load--it means the load connected is a resistor only. 2)inductive load--it means the load applied is an inductor only. 3)capacitive load--it means the load is capacitor only. 4)also there may be combination of all these types or any two of the above loads like capacitive -resistive load;capacitive -inductive load. NO LOAD:--- as it is very clear from the word itself that it is no load that means no load has been applied to the machine..i.e.the output terminal of machine is open circuited FULL LOAD:-- the maximum load value that can be applied to the machine at which it can work without damaging any part of the machine is called machine working at full load ---------mrityunjay pandey (kiit university ,btech 2nd year)
If a swing has a working load of 300 pounds and the rotation hook has a working load of 1000 pounds, what is the maximum weight of a person that would be allowed on the swing?
A water meter that says no load test means one thing. The thing that it means is iron loss.
In electrical system load means circuit carrying current . Isolator is device which make on ( Connect ) and off ( Disconnect ) of circuit from supply. When load is ON means carrying current and required to disconnect from supply , than is called on load isolation.Here required on load isolator. When load is OFF means not carrying current and required to disconnect from supply , than is called off load isolation.Here required off load isolator. On load isolators design is more precise than off load isolator because while isolating load during ON states create heavy sparking and transient voltage spikes.
SWL means Safe Working Load
To calculate the safe working load of a ship's bollard, you need the working stress and the force applied. These two will help you compute the safe working load.
the safe working load is the load the stand can support safely without failure. It Is called safe because it can generally stand up to five times the safe load but one should not intentionally exceed the safe load. Safe load is also called working load or rated load
The SWL stands for - Safe Working Load
The safe working load can be calculated using the 6 x 19 &. 6 x 36 classification.
The initials SWL mean Safe Working Load
Every six months
aprox 10 tonnes
S.W.L on a vehicle workshop hoist stands for Safe Working Load
Working Load Limit used for replacing Safe Working LoadBoth of these two terminologies are used for industry as load limit terminology when evaluating the maximum force allowable during lifting or holding. Because of numerous environmental factors, manufacturers no longer find the term "Safe Working Load" accurately descriptive for maximum rated loads in equipment standards.Manufacturers all over the globe are concerned with effectively assigning load limits to avoid "plastic deformation" or stress effects during continued use of rigging equipment. These limits do not infer safety because so many factors can affect equipment with use in various environmental heat, cold and wet extremes over time.
To convert breaking strain to safe working load you must establish a safety factor (SF). Assume SF of 10. If a line has a breaking strain of 1 tonne then you should only suspend or load the line to a strain of 100Kg (1000Kg/10) A common SF for normal use is 6. If human loads are in use then SF 10 is more common.
subtract the tare weight from gross weight, this is your net weight, after you multiply the weight the chain can support and how many chain you are using if this result is biger or same than the net weight then this is go na be your safe working load .