Want this question answered?
Some exciting DYI crafts for an amateur are projects such as ones which start out to be small items, such as painting an already carved item like a car. Building a small birdhouse is a perfect way for an amateur to start out crafting and then working their way up to a more difficult crafting project as they go along.
Well I did a science project,which is,Which 100% percent cotton fabric decompose faster than polyester fabric when it sits in bleach for one month? The Conclusion is correct to my Hypothesis cotton fabric will decompose faster than polyester fabric because polyester fabric is a man made fabric.
planning
Very difficult to do
It is a big job to attempt as an amateur if there is a large amount of wood flooring, firstly the work will require a lot of equipment and time for sanding, staining the wood, allowing it to dry and polishing it.
Very difficult to do
It depends on if you are mechincally incline to do it. It could be an all day project.
Roofing your home in a weekend is not for an amateur. Most roofing materials have a minimum life of 25 years. A professional roofer should be hired for this project. Venting, flashing, hips, and valleys are not for the inexperienced homeowner.
matter of opinion
A good way to control the unused portion of the fabric on a large piece is to use the same method quilters use. You need to take the portion you are not currently working on, and roll up the fabric to the working table level. You can tie yard around the roll to hold it together, or use a quilters roll holder which is a round piece of metal with one side open to clasp over the roll. Be sure to use an embroidery hoop large enough to help your work the project. Many embroidery machine supply shops offer classes to help you learn how to use your machine. It would be a good investment on your future to enroll in one of their classes.
Because, in most of the cases, the people who need to tell us what is required from the project are either not sure of what they want or are not clear in elaborating their needs.
The later you are in the project, the less time you have to fix the schedule if/when things go wrong. Early in the project, you can rearrange tasks, add resources or simply the project; later on, those options aren't available.