answersLogoWhite

0

What is the SDLC process?

Updated: 10/3/2023
User Avatar

Wiki User

13y ago

Best Answer

The Software Development Lifecycle (SDLC) is a conceptual model used in project management that describes the stages involved in an information system development project, from an initial feasibility study through maintenance of the completed application.

User Avatar

Wiki User

13y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

9y ago

The SDLC which also stands for System Development Life Cycle is usually a term used in software engineering, information system and system engineer. It is used to describe a process for creating, planning and or deploying an information system.

This answer is:
User Avatar

User Avatar

VareliTecnac

Lvl 3
3y ago

A core methodology and framework designed to define tasks performed at every level of software development is termed as Software Development Life Cycle (SDLC). Systematic and proper implementation of every stage is required to run the cycle. There are several complexities during the completion of the cycle. With the procedure of SDLC, software companies across the globe are into software application development. To handle the complication, a cycle with distinctive software development phases is followed such as planning, analysis, design, development, testing, deployment and maintenance. The above steps are maintained in a structured flow.

In a simple and straightway let us show the different phases of the cycle:

1. Planning and Analysis: This is the most important and crucial stage in the software development cycle. Here, what has to be carried out in the later stages are planned and analyzed. Requirements of the customer, the target audience, etc are studied in detail. If this stage gets wrong then perfect implementation of other stages will be in vain. Once the requirements are set out clearly, the project plan is also created. This stage requires research and analysis by the host company and the clients.

2. Design: A well and detailed understanding of the client's requirements is needed. Once it is done software developers and designers start to design the software. This stage comprises of codes, dashboard designs, screen layouts, and other documentation. All the functional and technical requirements are met. The overall design architecture from hardware to the software are looked into. Failure in this stage will be a great disaster for the whole project in the long run.

3. Development: This phase involves the coding of the software. The task is allocated among the programmers based on their expertise on the module or the technology. After the code is created, compilation is done by the developers. This is generally the prolonged phase in SDLC. Clients are engaged regularly to ensure that their expectations are being met. The output of this phase is tested in the next phase. In the development phase designs are translated into source code. All the components of the software are implemented and the time taken to complete this phase is generally long due to the complexity.

4.Testing: An integrated system is created with different components and subsystems. Testing is needed due to clients' satisfaction. It also needs hardware configuration and knowledge in coding for verification and validation. A team of personalized personnel is handed over the testing part. It has to be run regularly and automate the system for quick deployment. Unless the original specification is met testing continues and issues are fixed.

5. Deployment: After testing is done successfully, the software is delivered to the client. In this phase, the system is ready for deployment and installed on the client's premises. It is then ready to live. User training is required for the end-users to make sure they know how to use the system and to get familiar with it. The implementation phase also takes a long time and that depends on the complexity of the system and the accessibility of the client. 'Delivery of the software' is a common phrase used for deployment.

6. Maintenance: Necessary changes, the update of the software, correction in the codes are on the process once a software is delivered and is used by the client. Clients sometimes face issues, which are resolved and rectified within a stipulated time, which is generally termed as support services. The process of regular followup and making minor changes and enhancements on the software developed is maintenance.

To sum up, SDLC is important for custom software development and the structuring of a software application. Different SDLC models are studied depending on the requirement and purpose of the software application. Unless the requirements are met the cycle does not end. It does not work well and a certain level of uncertainty remains. Control of the development process ensuring system requirement is the greatest advantage of SDLC.

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the SDLC process?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What are the five phases of the sdlc?

what are the phases of the sdlc


What is the purpose of the SDLC?

for gathering data and information.


What is the difference between SDLC and STLC?

SDLC has both verification and validation activities where as STLC has only validation activity. Simply STLC is a part of SDLC


Explain spiral model in sdlc with the help of diagram?

explain spiral model in sdlc


Explain SDLC stages by taking example of EDP department?

SDLC stages by taking example of EDP department SDLC stages by taking example of EDP department


What are the difference between SDLC and System Methodology?

SDLC refers to a stage all systems naturally undergo, a methodology refers to an approach invented by humans to manage the events naturally occurring in the SDLC


What are the design stages of SDLC?

There are usually two design stages in SDLC. They are:High-level Design &Low-level Design


How many steps in sdlc?

5


What are the major differences between PDLC and SDLC?

See the graph in the related link. It clearly separates out the differences between PDLC and SDLC.


Why is a systems development process needed?

The system development process is needed to ensure the end success and efficiency of the software or other system. Using the SDLC method helps prevent mistakes and bugs that can cause problems later.


What is the software development life cycle?

Software Development Life Cycle (SDLC) is a framework that clearly describes all the steps included in software development at each phase. It involves the complete plan for planning, requirement, developing, deploying, and maintaining the software. In layman's language, SDLC specifies the whole cycle of software development. It includes all the steps involved in planning, creating, testing, and deploying a Software Product. Software Development Life Cycle In this guide, you will come to learn about Software Development Life Cycle (SDLC), its process, purpose, and phases. So, let us get started; Software Development Life Cycle Process Software Development Life Cycle is a method that explains all the steps involved in the development of prime-quality software. Moreover, the SDLC incorporates the overall life cycle of software from beginning to end. Complying with the SDLC process drives the development of the software in a systematic and disciplined manner. Software Development Life Cycle Purpose The purpose of the SDLC is to produce a high-quality software product that is rich in quality. Moreover, if we talk about the phases of the Software Development Life Cycle (SDLC), it includes; Requirement gathering and analysis Design Implementation or coding Testing Deployment Maintenance It is extremely important to follow the SDLC phases to provide the software product in a well-organized manner. For instance, let us suppose software needs to be developed and a team of professionals is assigned to work on it, and they are free to work as they want. Now, one of the developers decides to design first, whereas another one decides to code first. It can lead the software project to failure, and this is why you need SDLC to keep things on track.


What are the six phases of SDLC?

analyze phase