Doing it yourself or hiring an electrician? Yourself: About $300. An Electrician: About $2000

User Avatar

Wiki User

19y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the estimated cost of upgrading from 60A panel and replaced with a new 200A service?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How much does it cost to move an electricity meter?

The meter is typically installed in the main circuit panel of the house. If you want to move it, you can do it as part of a service / panel upgrade. We did this when we moved into our new house - we replaced the 1950s vintage main circuit panel and 100A service with a newer 200A panel and service. It was about a grand, but we didn't actually move the panel from where it was, so it may cost more for what you want.


How much is a new 5 ton central unit and installation?

Question does not provide enough info for a worthwhile answer: Do you already have ductwork or will it be part of the job? If you do have it then will you be upgrading the furnace too, if yes with what 80% 90%,95%? What SEER AC unit,what model? Cheapo builders grade or top of line? Do you have available electric service in your panel or will that need upgrading? Ok, you get the idea now so I`ll stop here.


Can a 1993 Ford Probe instrument panel be replaced with 1994?

Yes it can be replaced with 93-97 panel and most of the interior will also work and everything on the exterior will also work..


What is an service panel?

The place where the power drop from the electric company enters your house. The service panel is where the fuses or breaker switches are.


How much is a 3 phase 400 amp service panel?

The service panel itself is probably less than $200.


Flat panel televisions replaced what type of common tv set?

Flat panel televisions have been very popular for the past several years. Flat panel televisions replaced televisions with picture tubes called cathode ray tubes.


Breaker box is full?

You have two options, one is a complete service change. The average house service these days is 200 amps 42 circuits. The second option is to install a sub panel off the existing service. Depending on how many circuits you need will govern the size the sub panel. Here is where it gets tricky. Two side by side single pole breakers or one two pole breaker will have to be removed from the original service panel and replaced with a new two pole breaker. The size of this breaker will be governed by the total load of the new sub panel. The wire from the new sub panel to the two pole breaker is also governed by the load of the sub panel. As an electrician I would recommend that you not do it yourself but get a qualified electrician to do it for you. He would (should) take a permit out for the job and get it inspected.


What gauge of cooper service wire for 200A service to meter box and service panel?

bed


How is the controls for the power windows replaced?

depending on make and model usually the door panel is removed and then the switch is unhooked and replaced.


What are the steps in upgrading 120V 15A to a 240V 60A air condition panel?

You have to find Line 1 and Line 2 to get your 240 volts. Both do not exist in a 115vac panel. If coming from a main panel, you would install a 60amp 2 pole breaker and then run heavier wire to the a/c unit. A sub-panel could be added if no spaces are left tin the main panel.


Where is the service panel in 1999 ford Windstar?

On a 1999 Ford Windstar : What Ford refers to as the " service panel " is located in the cargo area on the passenger side of the vehicle


What is the largest sub panel you can install off from a 60 amp main panel fed by 100 amp service?

If what you state in this question is accurate this is an illegal installation. A 100 amp service can not have any equipment connected to it less that that of the service size. The 60 amp main panel must be a 100 amp panel to be a legal installation.