The factory power consumption cost in a month will vary on case by case basis depending on the size of the factory, and the nature of its operations. Some factories may average a few hundred dollars a month, while it can be in the hundreds of thousands for other types of factories.
Power consumption, lower cost in massive bulk.
Find the consumption of power in kwh for a given period. Find the corresponding cost. Divide cost by the total kwh. Most energy companies indicate the average kwh cost incurred for a given month in their monthly statements.
I dont have the yearly cost, but the standby mode power consumption of 50W1-30100 is right around 0.3W
Power consumption, lower cost in massive bulk.
Hi, Power cost is calculated in this manner. Net Power Generated divided by the quantity of input of [raw materials+men+energy losses] i.e in other words specific consumption of rawmaterials, specific consumption of man power resources, + energy losses per unit of power generated. All these when converted into cost will give raise to cost of power generated. Then, losses in the transmission is also taken into consideration. Thus Cost of power distributed is calculated.
Learn the power consumption of devices, they hours of operation and cost of power. Use this information to work out e.g. total power usage / year and cost / year.
The power consumption of this TV is 5 amps. It uses around 822 kilowatt hours a year average use.
No. They are a product cost/factory overhead cost
* 0.4A * (voltage of device V) = Power in watts P1 * P1/1000 = Power in kW P2 * P2 * (electric rate in dollars per kWhr) = Cost dollars/hr C * C * (days in this month) * 24 hr/day = Cost in dollars for this month
Factory heating cost is overhead cost and part of product cost as if there is no production there is no factory heating requires.
the rent a factory as you can imagine will be alot of money averaging between £4000-£5000 a month. Commercial buildings such as this are rented by area, usually in square feet or square meters.
Prime cost is a subset of Factory cost. Prime cost consist of Direct material, Direct labour and Direct expenses. Factory cost = Prime cost + Production OH