Want this question answered?
the lay ratio is the ratio between the lay length of the cabble and the Outer diameter af the cable( or the layer) lay ratio = lay length / OD and the lay ratio standard from ISO
Lay a long length of rope on the ground, straight out. Grab one end and jerk it upward and downward. A wave will pass down towards the other end of the rope, this is a transverse wave.
If the lay ratio of a standard conductor is increased, resistance will diminish.
It means spread or to lay out
no, a cloud is made of water and dirt particles. so if you were to lay on one you would fall through. this factor enables us to move through things such as fog.
the lay ratio is the ratio between the lay length of the cabble and the Outer diameter af the cable( or the layer) lay ratio = lay length / OD and the lay ratio standard from ISO
Look for the meaning of one lay length of a mooring hawser
Its shadow will be 50 millimeters in length, if you lay it down on a flat surface.
There are 2 main ways of laying up wiring used in common practice. The first is to lay the wires in a bundle keeping all wires untwisted and then tied together with lacing tape or coated Kevlar yarn. The second Method is to use a system called counter-helical winding, this teqnique involves twisting the wires around each other in oposite directions until the required amount of conductors are 'layed up'. There is a formula for calculating the most efficient lay-up. In most manufacturing workshops the formula is used to produce a lay up table, which lists the most efficient lay ups. unfortunatly i am unable to source either a table or the formula. an example of this is to use a single conductor to form a core and then to lay up 6 further conductors around this to make a perfect lay up of 7, bearing in mind all conductors must have the same diameter.
Red interior, large vault and many many qrt bottles and needles
The length of pipe is required to be known to help procure the required quantity of pipe.
this how you can figure it out it lay it out and measure it with a tap measure the an see what it comes out to be
It depends on how many tiles of each length that you have.
The general consensus is that Games are the "healthiest" and "smartest" birds. However, their rate of lay is awful and their eggs are pitiful. I would suggest buying quality dual purpose birds, bred for rate/length of lay.
Sturgeon lay between 40,000 and 200,000 eggs that hatch in approximately 13 days. An adult sturgeon weighs about 8-pounds and reaches 38-inches in length.
If you mean conductors instead of lines the wire is ACSR. Aluminium Conductors Steel Reinforced.ACSR is a concentric-lay-stranded conductor consisting of a single core wire or a stranded steel central core with one or more layers of stranded aluminium wires.
This will depend on the length of any lay overs. With no layovers, approximately four hours of flying time.