answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: What is the isolation and lock-off procedure or permit-to-work procedure that applies to the equipment being maintained?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the correct procedure to be followed when handing over maintained or installed equipment?

Suck the operator of like you never have before


Safe isolation procedure 3 phase?

safe isolation 3 phase


What are the implications of not carrying out the safe isolation procedure?

The implications of not carrying out the safe isolation procedure can be quite severe. In cases of a contagious disease, this will cause more people to be affected due to lack of isolation.


What is the principle involved in the isolation procedure?

DNA isolation is a based on the principle of purification. DNA samples are isolated through the use of physical and chemical methods. Friedrich Miescher conducted the first isolation of DNA in 1869.


What is the best description of a group lockout tag out?

Group lockout tag out is a safety procedure where multiple individuals working on the same equipment or machinery each place their own lock and tag on the energy isolation point. This ensures that everyone in the group is aware of who is working on the equipment and prevents the equipment from being energized until all locks and tags are removed. It helps to enhance safety by providing visual confirmation that all workers are accounted for and protected.


What is the last procedure when trouble shooting any equipment?

Replace broken equipment as it cannot be repaired.


What is the Automatic Weapons Doctrine?

The accepted procedure in deploying the equipment.


How do you cancel equipment lease?

The procedure should be listed in your contract.


What are the standard operating procedure to be when handling equipment?

just touch it then =)


What is the procedure for ensuring that all tools and equipment are available prior to undertaking the activity?

The procedure for ensuring that all tools and equipment are available prior to undertaking an activity is:assess needsgather needed tool and equipmenttest to confirm they work


Is this right The procedure describes the use of equipment and materials in an experiment?

ion know


What is the most important lab procedure?

PPE ( personal protective equipment) safety.