12 km
Look up the definition of the word "well."
Read the installation guide, if it`s not available the manufacturers nameplate on the unit will have it`s minimum/maximum power requirements.
the first drill press was invented 1433, by a man named Cleatious Fredrickk. he lived a simple life, in the shadows of the Alps, being the mining enthusiast that he was, Cleatious Needed to Drill! so he did, he drilled and drilled. until he invented the press, and he thought, "there should be a way for me to incorporate this with a drill to make my obsessive drilling less toiling". However he could not figure out the high level mathematical calculations involved in the engineering that would combine these two technologies. He lived the rest of his days obsessively drilling away rock by hand. On his 98 birthday cleatious had a dream, and in this dream the simple understanding of how to create a drill-press came to him. Unfortunately for cleatious he was at this time on his death bed, but he did manage to explain the dream in his dream diary that he faithfully kept on his night stand. He died two days later.
improvments in comunicaition and the basic way of life is made easier as well as a healthier life style for most with all the advancments in medical tech
The company man on an offshore drilling rig has the responsibility to supervise the execution of the approved drilling program, including all revisions made by drilling engineers. He is the top representative of the oil company which has hired or contracted other companies to drill the well. In the case of the BP oil spill, BP contracted Transocean for the rig and drilling of the well. BP contracted Halliburton to cement in the well. Each of these contractor companies keep the company man informed of what they are doing, and if they have problems, the company man must be informed and has final approval authority. In BP's case, and generally in most drilling operations, there is a morning meeting between the rig and the land based office, where the days activities are discussed. In BP's case, if the company man asks one of the contracting companies to do something not agreed upon or considered unsafe, the contracting company can refuse. The company man has many administrative activities, including compliance to all legal and safety regulations. In this regard, he works very closely with the Offshore Installation Manager, who is the drilling contractor's top manager. Finally, there are two company men onboard an offshore rig at all times, one for the day shift and one for the evening shift.
It was drilled in Pennsylvania by a man named Edwin Drake and he drilled the well in 1859 near titusville. By: Raysean Potts
1cm
In 1859, Edwin Drake was the first man to drill a commercial oil well in the US in the middle of quiet farm country in northwestern Pennsylvania in 1859.
the man drilled a hole using specialized drill equipment.
baby girl has the maximum frequency...
The center of the Earth is molten. The core is 6000 kilometers deep, the deepest man has drilled is 12 k.
Spider-Man and Venom Maximum Carnage - 1994 VG was released on: USA: 1994
There are many types of bobsleds 2-man Bobsleds maximum length:2.7 meters 4-man Bobsleds maximum length:3.8 meters
The crust. Often oceanic crust.Know that man has not yet managed to drill a hole past the crust. The deepest hole ever drilled is the Kola Superdeep Boerhole in Russia, which drilled about 1/3 of the way through the Earth's crust.
External, it was man vs man, man vs nature, and man vs self.
Please clarify the question.
between he-man and the hulk.