item 86 is (item is not available or sold out from the menu)
Object.
the meaning of keertan is a Telugu god item.
The meaning of glass drop is, when glass is dropping
Free on Road!
An item that belongs to a set
Yes, meaning a person or an item.
A mitre is an item of headgear.
Food is a physical item, meaning that you can touch and feel it. Therefore, it is not intangible; it is tangible.
Bar codes have a meaning because the meaning of a bar code is assigned to that bar code. A bar code identifies an item, and product information regarding that item is held in a data base.
What does the meaning of item that represents first stop on your trip mean.
knickknack